--->BUMP!<----
Wow some of the previous ones posted are good, here is one , although not as good but I find entertaining..
Wiring a parking lot for lights.. Journeyman shows up and has the excavator start digging between the two red stakes (assumed that was the markings for the outer edge of the island).. When the Foreman shows up he stops the excavator, and has a chat with the journeyman.. Excavator starts filling in the trench... Turns out the journeyman failed to read the markings on the stakes and had the trench 1.5 meters in the wrong direction..

Same job, same journeyman.. instructing the excavator operator where to dig for the conduits... The journeyman has the map with the locates in HIS HAND, and still has the poor operator excavate in the vicinity of a 2" gas main... Excavator found the main! $5G later!

Same job, Foreman and engineers mess up:
We were on the line truck digging out the 24" holes for the concrete bases... Foreman is saying "Deeper"... We heard a funny noise then noticed some blue plastic coming out of the hole... Oops, we found the center of a new storm sewer! It is exactly where its supposed to be according to prints, and so are our massively heavy concrete bases for these lights... One right on top of the other!


Same job SAME journeyman... Payback for him, entertainment for us:

We had just set the pole on top of its concrete base and said journeyman started adjusting the nuts and fastening hardware at the bottom in attempts to "level" this pole.. He cranked and wrenched until his level said the pole was straight but it looked WAY off.... Moved his level to another side and did the same thing, cranking and wrenching.. This went on for 35 minutes until he eyeballed it and made it look good.. Too bad the pole he had his level on was TAPERED.. too bad he didn't realize his level was not!