ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals

>> Home   >> Electrical-Photos   >> Classifieds   >> Subscribe to Newsletter   >> Store  
 

Featured:

 Electrical
 Clearance

 *
 Tools
 *

 Books

 *

 Test Equipment

 

Recent Gallery Topics:
What in Tarnation?
What in Tarnation?
by timmp, September 10
Plumber meets Electrician
Plumber meets Electrician
by timmp, September 10
Who's Online Now
0 members (), 582 guests, and 7 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
#134967 12/11/02 02:11 AM
Joined: Jul 2002
Posts: 8,450
Likes: 4
Trumpy Offline OP
Member
Paul has a topic on Alternative Energy,
May I post a side-line to this?.
What are the requirements for connecting an
AC Generator to an installation, where you live, where it is not required to give No-Break continuity.
Your thoughts, please-

Wire Pulling Tools for Electricians

Wire Pulling Tools for Electricians, Installers & Maintenance Technicians

#134968 12/12/02 03:33 PM
Joined: Aug 2001
Posts: 7,520
P
Member
The main requirement is that the generator feeds through a proper transfer switch, switching all phases across, or by other suitable interlocked switches so that there is no possibility of connecting the generator directly to the utility line.

I don't have the specs at hand, but there are certain minimum contact spacing requirements for such switches. and they need to have a center "off" position.

#134969 12/15/02 12:32 AM
Joined: Jul 2002
Posts: 8,450
Likes: 4
Trumpy Offline OP
Member
Paul,
Seemingly, if there is a chance that this type of equipment can back-feed into the
Grid system, does it need to be synchronised with the same?. [Linked Image]

#134970 12/15/02 07:31 AM
Joined: Aug 2001
Posts: 7,520
P
Member
No. The rules are based upon making sure that the generator can't back feed into the network, so there's no requirement for synchronization.


Link Copied to Clipboard
Powered by UBB.threads™ PHP Forum Software 7.7.5