IMO any structure we supply with electricity we also must provide a disconnect. There are a few exceptions like light poles and signs.
We do not supply electricity to the utility owned poles, it is up to them to require a disconnect or not.
![[Linked Image]](https://www.electrical-contractor.net/ubb/smile.gif)
Once you leave this utility owned pole the first structure
supplied on the premises would need a service disconnect switch.
A customer owned pole that simply carries the overhead line further in IMO is not a structure being
supplied by electricity.
A meter pedestal on the other hand IMO is being supplied by electricity. The meter uses electricity to operate.
A structure is
"That which is built or constructed." IMO a meter pedestal is a structure and would need a disconnect at it.
I have got to run but I will get back with some NEC sections.
![[Linked Image]](https://www.electrical-contractor.net/ubb/smile.gif)
It would be great to hear some other opinions on all this.