Interesting thread. [Linked Image]

IMO any structure we supply with electricity we also must provide a disconnect. There are a few exceptions like light poles and signs.

We do not supply electricity to the utility owned poles, it is up to them to require a disconnect or not. [Linked Image]

Once you leave this utility owned pole the first structure supplied on the premises would need a service disconnect switch.

A customer owned pole that simply carries the overhead line further in IMO is not a structure being supplied by electricity.

A meter pedestal on the other hand IMO is being supplied by electricity. The meter uses electricity to operate.

A structure is "That which is built or constructed." IMO a meter pedestal is a structure and would need a disconnect at it.

I have got to run but I will get back with some NEC sections. [Linked Image]

It would be great to hear some other opinions on all this.

Have a great day all. [Linked Image]

Bob


Bob Badger
Construction & Maintenance Electrician
Massachusetts