The way those panels are built, you have NO choice but to bundle,unless only running a limited number of circuits,my biggest gripe was w/ the rigid feeding the panel as its isolated/unbonded from panel because installer used a MA and a TA instead of locknuts to bring it into the panel.(The conduit was just shoved into the PVC fittings).