ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat Box
Recent Posts
HVDC Greece to Crete
by gfretwell - 08/06/20 02:28 AM
310.15 (B) 7 Feeders
by HotLine1 - 07/31/20 02:29 PM
What would be the ideal solution?
by Fleppin - 07/21/20 12:42 AM
NESC question
by gfretwell - 07/16/20 04:17 PM
Code Violation or just not good Practice?
by HotLine1 - 07/16/20 03:03 PM
New in the Gallery:
Facebook follies, bad wiring
FPE in Germany pt.2
Who's Online Now
0 registered members (), 13 guests, and 25 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
ahj / gc given you the wrong drawings? #52715 06/03/05 11:42 AM
Joined: May 2005
Posts: 54
B
britspark Offline OP
Member
how many of you have done a job on a site and then been told that the drawings that they supplied are the wrong ones and now you have to re do the whole job?

i was contracted to replace 13 Mercury low bay lights in a paint and paper supply house.

so we go to the site rope off and make safe the area we are working on and proceed to remove and replace the fittings.

the manager at the end of the day thanks us for an excellant job, we get a signature, go back to the office, agood day was had.

we invoice the job and get paid.

then i get a call from there head office and was requested to meet them on the job.

the man produces a drwing, it dont look nothing like mine., he says this is the one we should have used, we had a small heated discussion and i end up having to re do all the work again, and they dont wanna pay.

our conpany lawyer is now dealing with it.

any body else had this sort of problem and what did you do about it??

britspark

Work Gear for Electricians and the Trades
Re: ahj / gc given you the wrong drawings? #52716 06/03/05 12:53 PM
Joined: Jul 2004
Posts: 9,513
G
gfretwell Offline
Member
My wife is a builder and she is no stranger to bad plans.
IMHO
If you were never supplied with the right plan they pay. You fulfilled your contract.
If this was a mastered plan with a change order that you missed you pay. (some or all)
I think most of these problems could be fixed with a decent computer that only spits out the "right" plan and not some generic master with a dozen change order sheets.
But that may just be me.
I am amazed at how badly national corporate builders handle their plans.


Greg Fretwell
Re: ahj / gc given you the wrong drawings? #52717 06/03/05 12:56 PM
Joined: Dec 2004
Posts: 94
T
tkb Offline
Member
Sounds like you made the mistake of redoing the work with out agreeing that you would get paid for it again.

Since they gave you the wrong drawing, they got what they paid for the first time. I would consider this a change since you already completed the job based on the information that you were given.

Re: ahj / gc given you the wrong drawings? #52718 06/03/05 05:26 PM
Joined: Jan 2003
Posts: 1,429
L
LK Offline
Member
Your job was complete, and finished, new job new contract, once you make the change without a new agreement, it puts you in a difficult position, getting legal advice was a good move.
We had a commercial account with a planned job, we installed as per dwg., just as you said, a month later, we are asked to re do the entire job, no problem we presented them with another contract, never heard from them again, and it was good we lost that account, because they go out to a different low bid contractor for every job.


Featured:

2020 National Electrical Code
2020 National Electrical
Code (NEC)

* * * * * * *

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
pcsailor
pcsailor
Minneapolis, MN, USA
Posts: 21
Joined: September 2019
Show All Member Profiles 
Top Posters(30 Days)
BigB 3
Popular Topics(Views)
268,614 Are you busy
202,965 Re: Forum
191,341 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.7.3