The city of San Jose charges $166/hr for inspections. I believe the minimum time is .5 hrs so the $100 is not far off from what I’m used to. When you get a permit in San Jose they charge for inspection time based on the project. If you run out of time you have to pay additional fees before getting another inspection. When you call for an inspection you have to specify how long the inspection will take. If the inspector feels he/she needs more time than you requested you have to recall for another inspection.

If anyone is interested in looking San Jose’s fees here is a link: http://www.sanjoseca.gov/building/PDFHandouts/Feesch2005Aug9-2-2.pdf

Curt


[This message has been edited by caselec (edited 06-01-2006).]


Curt Swartz