We have been boring the HIs with this for a few days, I decided to bring it over here.


I understand the electrical inspector is now required to inspect the rebar used for a concrete encased electrode. The connection can be made outside the concrete if a piece of rebar is exposed for that purpose. Will the electrician be responsible for installing the piece of rebar you connect to? If not, what is his function here?
Does he just tie a piece of copper wire on the bar to show he was there?
Who provides that piece of rebar if the steel worker is not installing it?


This is the way it is done here and the first time the EC is involved is when he puts the acorn on in the last frame.
[Linked Image from members.aol.com]

[This message has been edited by gfretwell (edited 11-18-2005).]


Greg Fretwell