We are starting to inspect for the Ufer ground. 250.52 The Code requires 1/2 inch rebar. If the contractor uses 3/8 inch rebar do we ignore it, and go back to just using a ground rod and water plus Building steel when available. Some contractors around here just float pieces of rebar into the concrete and don't tie wire them together or have them raised up on chairs. Alan--