"How come they get kicked back out, sometimes again and again? Do the building departments just not treat the PEs with the proper reverence that they deserve?"

The building departments, are most likely scratching their heads, try to figure out where some of these guys got their seal from,
It's funny but I get better electrical prints, from mechanical engineers then I do from electrical engineers.

On the switch leg issue, I have seen switch leg conduits get so hot, you could cook an egg on them, signed, and sealed by an engineer.


Quote: I try to usually notate cases like that on the drawing explitely for this reason. Either way, if we all communicate a little better, I think there would be a lot less bad blood and jobs would go up a lot smoother

Steve, that is the way to go, it's a win win situation, when we work together.

"As to "George", he has no location in his profile, so my comments still apply to his posts. Perhaps Mr. Bill should require 'locations' in the profile?"

I agree!



[This message has been edited by LK (edited 02-09-2007).]