I've wired many a home with #12 minimum.
Used CXW 2-1/8" Deep gangable boxes.
Now, I still only use #14 for lighting circuits, all recepts are on #12 with 20A CB's, all pigtailed. Definitely got to put switched recepts on the end of the line, if one wants to go the top-switched bottom-hot split-recept thingee.
I like to put junction boxes to feed hots to switch boxes so that only one hot and no jumpers are taking up space, cramming dimmers into filled-to-the-limit boxes is just too much...
I'll occasionally drop a switch loop if it is convenient, usually it is if the J-box is in an attic.
The house I'm currently wiring has a shop that got EMT and 1-1/2 deep 4x4's (furred with 2" nominal) and plaster rings at 1/2"... Didn't want the DIY homeowner to drive a nail in the Romex when hanging his tools... Had to be real careful with wire count there too...