Bjarney,

You speak in a language I can readily understand.

That was beautiful, I got it (or I think I do) right away.

Thank you very much. [Linked Image] [Linked Image] [Linked Image] [Linked Image]

As for bringing it back on line, I was under the impression that the switches at the substations are remote controlled.

I thought someone would sit at a control center, open all switches, energize the feeds to the substations, then start bringing on the load in a controlled fashion.

Now after reading Marcs post I wonder if you need guys out in the field to do this.

If you need field guys to do this work it seems IMO that some more money should be spent on automation of local cutouts.

Thanks all, Bob