Maybe changing topics and need to start another thread, but exactly what do you require on your permit applications for elctrical? Does it just say kitchen remodel? Or does it list a specific number of outlets, appliances?
I have set up the application/fee schedule by number of openings(which has a definition I won't detail here) and appliances (and other categories such as equipment, special equipment, special conditions, and communication systems. I set up the fee structure to follow the NEC so I have a really close idea what the permit is for, what is going to be inspected (time spent, accurate/fair fees) and who is responsible for it. If the electrical application include 2 appliances for a kitchen remodel, I know the dishwaher and the disposal are the responsibility of the electrical contractor. If the electrical contractor tells me he didn't wire the disposal (and is not going to wire it) then the homeowner is responsible for hiring a new electrician who will need to pull a new permit (with a minimum fee at least, of course.) This new fee helps cover the rigamarole time and discourages these types of situations.