ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat Box
Recent Posts
Unusual Well Pump Switch Failure
by sabrown - 10/28/20 04:31 PM
Look at this mess...
by InspectorE - 10/27/20 09:09 PM
New tool
by gfretwell - 10/24/20 11:09 AM
Where is Everyone?
by Bill Addiss - 10/17/20 07:04 PM
New in the Gallery:
Facebook follies, bad wiring
FPE in Germany pt.2
Who's Online Now
0 registered members (), 18 guests, and 15 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Tilt Up Panels #40236 07/15/04 10:17 PM
Joined: Jul 2004
Posts: 3
D
Dave_D Offline OP
Junior Member
hello to the group. I have been assigned as foreman for a corporate office building. The building is going to be constructed of Tilt Up Panels that are built on site on top of the slab. The panels will be the finished interior walls of the building thus I have 78 boxes and related piping to install into these panels.

I am looking for suggestions, hints, or recommendations from those of you that have delt with these types of panels before. I need help mainly in the methods that you used to secure your raceway piping and boxes to the panels to hold them plumb and level to the finished side of the panel face.

Any help would be great appreciated. You may leave your comments here or if you wish email me directly at k0pwo@comcast.net

Thanks for your time.

Dave

Work Gear for Electricians and the Trades
Re: Tilt Up Panels #40237 07/16/04 12:01 AM
Joined: Jul 2004
Posts: 625
S
SolarPowered Offline
Member
I've had the misfortune of spending way too much time in some of those buildings.

It appears that all the power is routed above the dropped ceilings, and comes down poles into modular office systems. Conference rooms have at least two or three internal walls, which are made with metal studs, and are also fed from the ceilings.

Re: Tilt Up Panels #40238 07/16/04 08:42 AM
Joined: Dec 2003
Posts: 751
E
earlydean Offline
Member
RedDot (T&B) makes a nice conduit hub for this purpose. We would just nail the boxes to the form and tie-wire the pipes to the re-bar , then flush cut the nails after the forms were stripped. Pre-fab as much as possible to save time.


Earl

Featured:

2020 National Electrical Code
2020 National Electrical
Code (NEC)

* * * * * * *

2020 Master Electrician Exam Preparation Combos
2020 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
Trumpy
Trumpy
SI,New Zealand
Posts: 8,337
Joined: July 2002
Show All Member Profiles 
Top Posters(30 Days)
Popular Topics(Views)
271,058 Are you busy
205,042 Re: Forum
193,167 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.7.3