ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Violation?
by renosteinke - 01/27/23 09:52 PM
Does NEC 551.71 (F) apply to dwellings?
by BigB - 01/20/23 10:46 AM
Power submeter connections
by HotLine1 - 01/19/23 09:09 AM
AFDD's coming to the UK
by Texas_Ranger - 01/17/23 07:22 PM
New in the Gallery:
Burger King crown sillyness
Burger King crown sillyness
by wa2ise, December 11
240/208 to a house
240/208 to a house
by wa2ise, October 9
Who's Online Now
0 members (), 29 guests, and 14 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
#40236 07/15/04 09:17 PM
Joined: Jul 2004
Posts: 3
D
Dave_D Offline OP
Junior Member
hello to the group. I have been assigned as foreman for a corporate office building. The building is going to be constructed of Tilt Up Panels that are built on site on top of the slab. The panels will be the finished interior walls of the building thus I have 78 boxes and related piping to install into these panels.

I am looking for suggestions, hints, or recommendations from those of you that have delt with these types of panels before. I need help mainly in the methods that you used to secure your raceway piping and boxes to the panels to hold them plumb and level to the finished side of the panel face.

Any help would be great appreciated. You may leave your comments here or if you wish email me directly at k0pwo@comcast.net

Thanks for your time.

Dave

#40237 07/15/04 11:01 PM
Joined: Jul 2004
Posts: 625
S
Member
I've had the misfortune of spending way too much time in some of those buildings.

It appears that all the power is routed above the dropped ceilings, and comes down poles into modular office systems. Conference rooms have at least two or three internal walls, which are made with metal studs, and are also fed from the ceilings.

#40238 07/16/04 07:42 AM
Joined: Dec 2003
Posts: 751
E
Member
RedDot (T&B) makes a nice conduit hub for this purpose. We would just nail the boxes to the form and tie-wire the pipes to the re-bar , then flush cut the nails after the forms were stripped. Pre-fab as much as possible to save time.


Earl

Link Copied to Clipboard
Featured:

Tools for Electricians
Tools for Electricians
 

* * * * * * *
2023 National Electrical Code (NEC)
2023 NEC Now Available!
 
* * * * * * *

2020 Master Electrician Exam Preparation Combos
2020 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
Niko
Niko
Campbell, CA
Posts: 356
Joined: August 2006
Top Posters(30 Days)
BigB 9
triple 3
Popular Topics(Views)
302,566 Are you busy
231,913 Re: Forum
216,548 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.7.5