ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals

>> Home   >> Electrical-Photos   >> Classifieds   >> Subscribe to Newsletter   >> Store  
 

Featured:

 Electrical
 Clearance

 *
 Tools
 *

 Books

 *

 Test Equipment

 

Recent Gallery Topics:
What in Tarnation?
What in Tarnation?
by timmp, September 10
Plumber meets Electrician
Plumber meets Electrician
by timmp, September 10
Who's Online Now
0 members (), 224 guests, and 8 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Page 1 of 2 1 2
#111539 12/29/06 09:13 PM
Joined: Jan 2005
Posts: 5,485
Likes: 5
Cat Servant
Member
We've all seen parts assembled in creative ways. This one, however, deserves an award:


[Linked Image]

[This message has been edited by renosteinke (edited 12-29-2006).]

Insulated Tools for Electricians

Insulated Tools for Electricians, Installers & Maintenance Technicians

#111540 12/29/06 09:33 PM
Joined: Oct 2006
Posts: 745
E
Member
Wow, they have a real handyman on staff at that place, don't they? Most smart people would have never been able to come up with such an ideal solution. Things that make you go hmmmm.


---Ed---

"But the guy at Home Depot said it would work."
#111541 12/29/06 11:17 PM
Joined: Nov 2005
Posts: 507
M
Member
i'm beginning to wonder if these are all your handywork, just so you can take pictures and submit them [Linked Image]

j/k.

#111542 12/30/06 12:04 PM
Joined: Feb 2004
Posts: 1,440
Member
Now there's one I haven't seen before!
John, are there wires actually going from the right hand bell box through the back into the SLB?

#111543 12/30/06 01:47 PM
Joined: Feb 2002
Posts: 840
C
Member
Is there any work in Reno that is actually good?


Peter
#111544 12/30/06 01:50 PM
Joined: Jan 2005
Posts: 5,485
Likes: 5
Cat Servant
Member
Yes, the wires enter the box 'through' the top of the SLB.

What also might not be obvious is that the left-hand box is rotated for a reason; the reason is to allow connection of the second pipe - which is located behind the pipe from the SLB.
The two boxes are connected with a rigid nipple. It is not possible for the boxes to move relative to each other; the nipple is corroded fast in place.

#111545 12/31/06 10:32 AM
Joined: Jul 2002
Posts: 8,450
Likes: 4
Member
John,
Why is there a hole in the side of that building?.
Or is that the biggest air vent the owner could afford, after you'd submitted your bill?.
And why is there a hose coming through it?.

{Message edited to add full-stops.}

[This message has been edited by Trumpy (edited 12-31-2006).]

Insulated Tools for Electricians

Insulated Tools for Electricians, Installers & Maintenance Technicians

#111546 12/31/06 12:45 PM
Joined: Sep 2002
Posts: 947
Likes: 4
N
Member
Mike, it looks to be the plenum off the A/C unit next to it, the "hose" is sealtite that is prob. feeding power to unit.

#111547 12/31/06 03:34 PM
Joined: Jan 2005
Posts: 5,485
Likes: 5
Cat Servant
Member
Mike, here's a view of the other side of that unit.

The "hose" is a piece of sealtite that starts at the first "bell" box (see the 90 fitting on the end?), passes through a gap under the duct, attaches to a vertical piece of pipe (not visible), then returns to sealtite ... seen in this pic flying through the air, with but an unusual assortment of fittings in the middle!

[Linked Image]


Here's a closer look:


[Linked Image]

#111548 12/31/06 04:12 PM
Joined: Feb 2004
Posts: 1,440
Member
Why go all the way to the supply house when we have a couple short pieces of sealtite and these extra sealtite 90's and ½" couplings around! [Linked Image from img.photobucket.com]

Page 1 of 2 1 2

Link Copied to Clipboard
Powered by UBB.threads™ PHP Forum Software 7.7.5