ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Increasing demand factors in residential
by tortuga - 03/28/24 05:57 PM
Portable generator question
by Steve Miller - 03/19/24 08:50 PM
Do we need grounding?
by NORCAL - 03/19/24 05:11 PM
240V only in a home and NEC?
by dsk - 03/19/24 06:33 AM
Cordless Tools: The Obvious Question
by renosteinke - 03/14/24 08:05 PM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
0 members (), 265 guests, and 15 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Joined: Oct 2000
Posts: 2,749
Member
This picture shows electrical crews working in a "foreign" country.

[Linked Image]

[This message has been edited by Joe Tedesco (edited 07-14-2002).]


Joe Tedesco, NEC Consultant
Stay up to Code with the Latest NEC:


>> 2023 NEC & Related Reference & Exam Prep
2023 NEC & Related Reference & Study Guides

Pass Your Exam the FIRST TIME with the Latest NEC & Exam Prep

>> 2020 NEC & Related Reference & Study Guides
 

Joined: Apr 2002
Posts: 2,527
B
Moderator
Occasionally, it does work both ways.

[Linked Image from powerlineman.com]

 



[This message has been edited by Bjarney (edited 07-03-2002).]

Joined: Oct 2000
Posts: 5,392
S
Member
it simply takes enough to be 'safe'

Joined: Feb 2002
Posts: 2,233
H
Member
Joe,


Here in Northern NJ, I believe the power co. requires for 2 men per truck. 1 in the bucket and 1 on the ground at a minimum. They will send out more than 1 truck o a scene of an accident to try and get things repaired quickly. However with de-regulation and with the companys required to make a profit, The power company has cut back on man power. What use to take an hour to fix, now takes 1/2 a day. What use to take 1/2 a day now goes into 2-3 days. There just isn't enough manpower here anymore to handle the problems. The power co. has downsized their people, yet they turn around and hire all sorts of sub contractors. I have seen utility crews from PA., Mich., NY., Ohio, and several other sub contractors from out of NJ working here.

Caper

Joined: Mar 2002
Posts: 95
J
Member
God bless the TVA, and public power around here. Most evertyhing in our area is still public utilities, non-profit, and non-cut corners, power is still dirt cheap and plentiful. Thanks Mr. Roosevelt , daddy got job with TVA we bought a washing machine and then a Chevrolet.


Lighting the way
Joined: Jul 2002
Posts: 8,443
Likes: 3
Member
Over here Electricians are not allowed
near the lines, apart from pulling
HRC pole fuses.
I am a Faultsman, I am registered both as
an Electrician and a Line Mechanic,
but I can see where you guys are coming
from, but I did notice, the very heavy
insulation on the lines in the picture.
Over here, we work on 11kV,33kV and 66kV
lines, every thing is bare, if it is
around people, it is underground,
but if it is out in the rural areas of
Canterbury, you have to turn off the juice.