If they are telling the installer they need a 12" x 12" #8 copper grid with a clamp at every intersection they are doubling the price of the shell. Essentually they are outlawing epoxy encased rebar.
Actualy I have never seen it in a pool but these are only half million to 1m houses ;-)


Greg Fretwell