Mustang
Why have a meterbase with a disconnect on a pole and then run over to another disconnect on a pole within 30 feet of the mobile home then run to the main panel within the mobile home?
That three OCPD'S on a single service
Remember a disconnect does not mean an OCPD.
The requirement for OCP is another section.