Hi Teach..

sorry mate but if you noticed i put down the size of the bathroom,, and anyway the socket was in zone 2 so thats a no no in my book..so was the drier and oil heater..

its all right you all saying that its ok on an rcd, but how many of these get tested after we have fitted them??

was on a small extension to a house last week with a tt system, thought i better test the rod,, yep no earth,, so much for your rcd now..had to install 2 new rods to get a reading..

anyway the point i was making was that the contractor was in the NICEIC..



[This message has been edited by PaulCornwall (edited 06-29-2004).]