Well it turns out the inspector wouldn't even inspect the job because they didn't have the panel mounted, the ground rod driven, or the gas and water bond in. So now they want me to do the sub feed, gas & water bond, and the ground rod. I told them i don't want any connection to the job. FYI the reason for the all #12 wiring is because the architect had it as a note on the drawings(that way the wire can burn longer before the breaker trips) I don't know if you guys noticed but in pic#2 if you look close you can see that they used 1/2 driven nails and bent them over to use as romex staples. When my electrician friends come over I give them the worlds worst wiring job tour.