ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Shout Box
Recent Posts
VDE 0100 to introduce AFCIs
by LongRunner. 01/17/18 10:32 AM
Fujifilm Recalls Power Adapter Wall Plugs
by Admin. 01/16/18 07:04 PM
Air Compressor feeder conductor sizing
by Potseal. 01/15/18 09:08 PM
Under carpet cable?
by HotLine1. 01/15/18 09:57 AM
New in the Gallery:
Housebilding DIY wiring
SE cable question
Who's Online Now
0 registered members (), 26 guests, and 7 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Meterbase Clearances #90801
12/11/04 07:43 PM
12/11/04 07:43 PM
M
mustangelectric  Offline OP
Member
Joined: Feb 2004
Posts: 494
Bentonville, AR
Hi,
I know that a drip loop has a 3 foot clearance from any window or door but what about a meterbase that is fed from a service lateral?

I do not think the code addresses that do they?

I know there is a height requirement usually 5-6-6" around here.

Thanks for any replies.

-regards

Greg


Electricity has no respect for ignorance!
2017 / 2014 NEC & Related Books and Study Guides
Re: Meterbase Clearances #90802
12/11/04 08:15 PM
12/11/04 08:15 PM
T
trekkie76  Offline
Member
Joined: Jun 2004
Posts: 220
baileyville, maine, usa
I would have to say no. Look at 230-9(A). Unless your lateral is open conductors or a multiconductor cable without a overall outer jacket, It can be as close to the window as you like. A meter socket is accessible from the ground, so why would it matter if the conductors where 3' from a window, when I could go outside and touch them?

Re: Meterbase Clearances #90803
12/11/04 08:33 PM
12/11/04 08:33 PM
M
mustangelectric  Offline OP
Member
Joined: Feb 2004
Posts: 494
Bentonville, AR
Hi,
Thanks for the reply..I do not know what the feeder will be because the POCO installs the feeder from their xfmr to the meterbase using the 3" conduit I installed.

What is the requirement with a multiconductor cable underground?

-regards

Greg


Electricity has no respect for ignorance!
Re: Meterbase Clearances #90804
12/11/04 08:56 PM
12/11/04 08:56 PM
O
OreElect  Offline
Member
Joined: Mar 2004
Posts: 98
Salem,Oregon.USA
http://www.portlandgeneral.com/business/builders_and_dev/PDF/chapter5.pdf
http://www.portlandgeneral.com/business/builders_and_dev/PDF/chapter3.pdf

Meter clearances hear must apply to Electric service requirements from local power company.
Its a good idea to get a current ESR from your local power co.Has all the information,clearences and requirements

[This message has been edited by OreElect (edited 12-11-2004).]


Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
akmaster
akmaster
alaska
Posts: 70
Joined: June 2012
Show All Member Profiles 
Top Posters(30 Days)
sparky 23
Admin 20
Potseal 13
Popular Topics(Views)
243,524 Are you busy
180,323 Re: Forum
170,816 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.6.1
(Release build 20180101)
Page Time: 0.015s Queries: 14 (0.004s) Memory: 0.9584 MB (Peak: 1.0905 MB) Zlib enabled. Server Time: 2018-01-17 17:43:46 UTC