ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Shout Box
Recent Posts
Air Compressor feeder conductor sizing
by Potseal. 01/15/18 09:08 PM
VDE 0100 to introduce AFCIs
by LongRunner. 01/15/18 11:38 AM
Under carpet cable?
by HotLine1. 01/15/18 09:57 AM
Any New Years Resolutions?
by Bill Addiss. 01/13/18 10:21 AM
New in the Gallery:
Housebilding DIY wiring
SE cable question
Who's Online Now
0 registered members (), 19 guests, and 11 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
power to a bussiness sign #61831
02/02/06 10:54 PM
02/02/06 10:54 PM
N
nov  Offline OP
Member
Joined: Aug 2004
Posts: 69
New Jersey
I need to get power out to a pole sign in front of a bussiness. The sign and two parking lot lights were feed from an under ground pipe run that was crushed or broken years ago. Owner who is a friend of mine does not want to cut the concrete and have to patch it. I was think of going over head with triplex. It is only about 25-30 feet from the building. Would this be the way to go or sould I tell him that he has to cut the pavement. I have never done a I set up like this over head. If it was not a friend I would suggest someone else, I still may do that though.

Work Gear for Electricians and the Trades
Re: power to a bussiness sign #61832
02/03/06 12:22 AM
02/03/06 12:22 AM
R
Rich R  Offline
Member
Joined: Apr 2005
Posts: 27
Florida
If he wants to spend the money you do a directional bore underground where the asphalt/pavement wouldn't be disturbed. Around here most companies that sub that type of work charge $10/foot or a $400 minimum. They even install a pull string for us in the pipe.

This is assuming you have some sort of grass or dirt area for them to bore to and from

[This message has been edited by Rich R (edited 02-03-2006).]

Re: power to a bussiness sign #61833
02/03/06 08:05 AM
02/03/06 08:05 AM
N
nov  Offline OP
Member
Joined: Aug 2004
Posts: 69
New Jersey
no grass or dirt
concrete and pavement all the way

Re: power to a bussiness sign #61834
02/03/06 12:13 PM
02/03/06 12:13 PM
M
mhulbert  Offline
Member
Joined: Oct 2004
Posts: 132
Anaheim, CA USA
If he wants the ulginess of OH wires, you can do that. I've run a few OH spans, but they were all with the help of a lineman friend of mine. He had the tools, mainly the Klein cable grip, and a truck full of preforms, insulators, tree standoffs, etc. I ran pipe up to weather heads on both ends of the drops, and we used crimps as open air splices. Remember taht you shouldn't use the bare messenger cable as neutral, it will be your ground.

Re: power to a bussiness sign #61835
02/03/06 07:58 PM
02/03/06 07:58 PM
L
LoneGunman  Offline
Member
Joined: Oct 2005
Posts: 141
Florida
I dont see what the big deal is about cutting and patching 25' of concrete. Ever see the little trenching shovels that are only like 2" wide? Thats what Id use. A 3" cut is not going to be hard to patch.

Re: power to a bussiness sign #61836
02/03/06 11:35 PM
02/03/06 11:35 PM
C
Clydesdale  Offline
Member
Joined: Nov 2004
Posts: 138
rent a gas saw with concrete blade. zip 2 lines, chip out. then take large hilti hammer drill, and dig trench. done..
you already knew that though.

Re: power to a bussiness sign #61837
02/04/06 10:26 PM
02/04/06 10:26 PM
mxslick  Offline
Member
Joined: Oct 2004
Posts: 803
Atomic City, ID USA
Just wait 'till the first tall vehicle comes thru and snags the overhead, pulling down the drop and possibly the sign. [Linked Image]

C'mon, I've cut 30' plus to drop in pipe before, it's not a big deal. [Linked Image]

Some city sign ordinances may not allow an overhead feed anyway.


Stupid should be painful.

Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
Posts: 165
Joined: March 2007
Show All Member Profiles 
Top Posters(30 Days)
sparky 23
Admin 19
Potseal 13
Popular Topics(Views)
243,511 Are you busy
180,298 Re: Forum
170,800 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.6.1
(Release build 20180101)
Page Time: 0.020s Queries: 14 (0.004s) Memory: 0.9829 MB (Peak: 1.1353 MB) Zlib enabled. Server Time: 2018-01-16 15:23:09 UTC