This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
1 members (gfretwell), 32 guests, and 14 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Page 1 of 2 1 2
#98053 05/02/06 08:40 AM
Joined: Jun 2004
Posts: 32
K
Member
We are currently working on a building with exterior walls constructed of prefabricated SIPs. Any nessecary wiring is run in a chase cut out with a hot knife and MC cable laid in the cutout, after the cable is installed the insulation is trimmed and reinstalled with metallic tape used to seal the over it. We were instructed by the manufacturers rep. on-site that this was acceptable. Our local AHJ has asked raised a concern about heat buildup in the cable as installed and wants documentation that this installation is acceptable. The only response I can get fron the manufacturer is " that is how we always do it". Has anyone else run into this? If so, how was it finally resolved?
KB

Stay up to Code with the Latest NEC:


>> 2023 NEC & Related Reference & Exam Prep
2023 NEC & Related Reference & Study Guides

Pass Your Exam the FIRST TIME with the Latest NEC & Exam Prep

>> 2020 NEC & Related Reference & Study Guides
 

#98054 05/02/06 10:33 PM
Joined: Oct 2000
Posts: 2,723
Likes: 1
Broom Pusher and
Member
This situation may be one where you need to
"let the Manufacturer and the Building Department Fight It Out"

Try looking through the Company's website for documents which support the claim(s), then present these items to the Inspector or Building Department to see if they accept it or not.

If no documents are available to support the claim(s), or the AHJ (Building Department) does not accept the documents, let the Manufacturer take over, and come up with a method which will conform to your DBS's minimums plus not be a complete loss for you and the Mfr.

Good luck, and let us know what the outcome is.

Scott35


Scott " 35 " Thompson
Just Say NO To Green Eggs And Ham!
#98055 05/02/06 10:46 PM
Joined: Jan 2004
Posts: 1,507
G
Member
Am I the only one that does not know what a "SIP" or a "DBS" is? It would be nice if you guys would spell thing out for us dummies.


George Little
#98056 05/02/06 11:06 PM
Joined: Mar 2004
Posts: 814
B
Member
"Am I the only one that does not know what a "SIP" or a "DBS" is? It would be nice if you guys would spell thing out for us dummies."

No George, you're not the only one. But myself, I have always subscribed to the idea that it's better to remain silent and let everyone think you don't know anything than to open your mouth and prove it. [Linked Image]

#98057 05/02/06 11:15 PM
Joined: May 2004
Posts: 116
S
Member
George Little -

"Am I the only one that does not know what a "SIP" or a "DBS" is? It would be nice if you guys would spell thing out for us dummies."

Nope, I would be one of the other dummies that doesn't know what "SIP" and DBS" means.

BigB -

"No George, you're not the only one. But myself, I have always subscribed to the idea that it's better to remain silent and let everyone think you don't know anything than to open your mouth and prove it. "

But if I stay quiet, then how will I "know" what "I don't know"?

Besides, how will all the other dummies that don't speak up find out (g).


Thanks
Steve
#98058 05/03/06 12:11 AM
Joined: Feb 2005
Posts: 693
L
Member
I believe SIP means "Structural Insulated Panel", and is a pre-sheathed bunk of insulation. Not sure about DBS beyond satellite TV.


Larry Fine
Fine Electric Co.
fineelectricco.com
#98059 05/03/06 02:37 AM
Joined: Jun 2004
Posts: 1,273
T
Member
Department of Building Standards ?


Tesla
#98060 05/03/06 03:19 AM
Joined: May 2003
Posts: 2,876
E
e57 Offline
Member
Is a SIP simular to an API?


Mark Heller
"Well - I oughta....." -Jackie Gleason
#98061 05/03/06 06:40 AM
Joined: Jun 2004
Posts: 32
K
Member
Sorry guys! A SIP is a structural insulated panel. These are styrofoam filled metal stud wall panels. They come in prefabricated panels and are stood up on site. The building looks like a big white styrofoam cooler. Siding and sheetrock will be installed as usual. The manufacturer has no info. avalible on-line and so far has not been able to provide any.
KB

#98062 05/03/06 08:49 AM
Joined: Apr 2006
Posts: 1
J
Junior Member
I believe what your AHJ is looking for is a sealed letter from the company engineer that this product is safe to use in these walls. As an inspector I required letters myself, Good Luck.