ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals

>> Home   >> Electrical-Photos   >> Classifieds   >> Subscribe to Newsletter   >> Store  
 

Featured:

 Electrical
 Clearance

 *
 Tools
 *

 Books

 *

 Test Equipment

 

Recent Gallery Topics:
What in Tarnation?
What in Tarnation?
by timmp, September 10
Plumber meets Electrician
Plumber meets Electrician
by timmp, September 10
Who's Online Now
0 members (), 977 guests, and 9 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
#83893 02/23/03 10:58 PM
Joined: Feb 2003
Posts: 2
N
nancyf Offline OP
Junior Member
I have searched all over the internet and can not find the answer to my question. I would appreciate it if one of you knowledgeable folks could help me. I had a swimming pool installed in November, and did all the necessary work, like moved lines, changed my electrical service and had some underground wires run into the house. I passed a final inspection on 11/11/02 and now out of the blue I get a notice of violation in the mail 3 months later. I have no clue what this is and would like to approach them with some knowledge. The violation says
Not approved. Michigan Residential Code 3306-4. I live in Michigan if that helps. I am sorry if these kind of questions are not appropriate, but I really need to know. I would like to thank anyone in advance that can help me.....

Work Gear for Electricians and the Trades

Workgear for Electricians

#83894 02/23/03 11:27 PM
Joined: Sep 2001
Posts: 25
D
Member
Don't know what final was done in november, whether it was building, electrical or plumbing. (yes these are different inspectors usually)

But as for the violation, the code section reads as follows:
E3306.4 Stranded conductors. Where installed in raceways,
conductors of size No. 8 and larger shall be stranded. A solid
No. 8 conductor shall be permitted to be installed in a raceway
only to meet the requirements of Section E4104.

(E4104 deals with pool bonding).

My advise is to contact the inspector and see exactly what needs to be fixed)

Don

#83895 02/23/03 11:34 PM
Joined: Feb 2003
Posts: 2
N
nancyf Offline OP
Junior Member
Thanks Don. I don't understand a bit of it but, thanks for taking the time to respond. The final inspection I passed in November was for Underground electric, change of service and final electric. I have no idea why they came out 3 months later and said something was wrong. I am sure it is a political issue (long story) and thats why I wanted a little knowledge before talking to the inspector tomorrow. Thanks again!!

#83896 02/24/03 07:40 AM
Joined: Oct 2001
Posts: 135
W
Member
It would seem to me that if you have a final inspection tag in hand, they will have a hard time putting the Genie back in the bottle.

#83897 02/24/03 10:50 AM
Joined: Nov 2002
Posts: 9
M
Junior Member
Nancy, If I were you I would contact your eletrical contractor and ask him about this. You should get at least a one year waranty on his workmanship. Hopefully he can rectify this problem. Good Luck!

#83898 02/25/03 01:45 AM
Joined: Feb 2001
Posts: 308
S
Member
Sorry, I don't live in Michigan so am unfamilair with the code references but what was the final inspection for? The electric service to the house? The electrical final may not have been a final for the electrical or bonding for the pool.

As far as politics are concerned, I won't say it doesn't happen, but I am one town outside of Chicago (the most corrupt town on the planet as it used to be known) and am not abreast on developments or political issues. Usually inspectors are genuinely concerned with your safety, even if you don't understand the code.


Link Copied to Clipboard