ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Happy Thanksgiving all!
by gfretwell - 11/30/22 05:55 PM
EMC Glands on Motors
by gfretwell - 11/30/22 05:53 PM
Ground Rods: Installation and Hook-Up
by gfretwell - 11/30/22 05:45 PM
Colt Firearms Switchbox
by NORCAL - 11/29/22 01:04 AM
Perfect work light?
by gfretwell - 11/22/22 12:48 AM
New in the Gallery:
240/208 to a house
240/208 to a house
by wa2ise, October 9
Now you know.
Now you know.
by Tom_Horne, September 7
Who's Online Now
1 members (Scott35), 17 guests, and 10 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
#82921 12/22/02 08:23 AM
Joined: Sep 2002
Posts: 11
M
MJR Offline OP
Member
I was called to upgrade fuse boxes in an older mobile home to a 100A breaker panel. When I inspected the job, I noticed that the trailer used a permanent feeder from the service equipment (mounted on a nearby utility pole)that consisted of #2 SE cable. I wasn't sure if I could connect the new panel to this cable, or if I have to replace it with a four-wire feeder. After checking Article 550, it seemed to me that there was a lot of contradiction in Parts II and III as to which way to proceed (i.e. 550.10(I)(1), and 550.33 (A) exception.
If I can re-use the existing SE cable, do I need to drive a ground rod at the trailer panel (in addition to the one at the service equipment location of course), or am I not supposed to?
Also, the existing fuse panels are located in a rear bedroom closet, in violation of 550.11(A). Can I still place the new panel there, as it is a replacement and not new work?
Lastly, since I'm trying to do everything else right, I intend on using AFCIs for the bedrooms, but I was wondering if in this situation that would be considered a requirement.
Thanks for any feedback!
Michael

Stay up to Code with the Latest NEC:


2020 NEC & Related Reference & Study Guides
2020 NEC & Related Reference & Study Guides
Pass Your Exam the FIRST TIME with these Exam Prep Combos:
 

>> Master Electrician Exam Prep     >> JourneyMan Electrician Exam Prep
 

#82922 12/22/02 06:20 PM
Joined: Oct 2000
Posts: 5,392
S
Member
Michael,

is the se (triplex i assume) comming from a meter/main at the pole?
the rest of what your asking may well be the call of the local AHJ
re; existing vs. upgrade

#82923 12/24/02 12:35 AM
Joined: Apr 2001
Posts: 54
W
Member
Micheal, around here what we do in such a case is change the panel and the feeded if it is not four wire. no need for a ground rod. far as the afci, ahj would call on that. most of the time if we do not touch it we dont have to bring it up to code.
i would ask your local inspector what do they require and go from there.

#82924 12/24/02 01:15 PM
Joined: Sep 2002
Posts: 11
M
MJR Offline OP
Member
After closer examination of what would be involved and a chat with my local inspector, this job may be a lot like opening a HUGE can of worms.
I think I'd be smart to pass on this one. Sometimes the money just isn't worth it...


Link Copied to Clipboard
Featured:

Tools for Electricians
Tools for Electricians
 

* * * * * * *
2023 National Electrical Code (NEC)
2023 NEC Now Available!
 
* * * * * * *

2020 Master Electrician Exam Preparation Combos
2020 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
AllClear
AllClear
Belmond Iowa US
Posts: 44
Joined: August 2005
Top Posters(30 Days)
Trumpy 7
NORCAL 5
Popular Topics(Views)
300,340 Are you busy
230,001 Re: Forum
214,810 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.7.5