ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Do we need grounding?
by gfretwell - 04/06/24 08:32 PM
UL 508A SPACING
by tortuga - 03/30/24 07:39 PM
Increasing demand factors in residential
by tortuga - 03/28/24 05:57 PM
Portable generator question
by Steve Miller - 03/19/24 08:50 PM
240V only in a home and NEC?
by dsk - 03/19/24 06:33 AM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
0 members (), 184 guests, and 12 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Joined: Oct 2000
Posts: 4,116
Likes: 4
Member
I've had an inquiry asking about a City of Los Angeles Building Code. Is there such a thing?

Bill


Bill
Stay up to Code with the Latest NEC:


>> 2023 NEC & Related Reference & Exam Prep
2023 NEC & Related Reference & Study Guides

Pass Your Exam the FIRST TIME with the Latest NEC & Exam Prep

>> 2020 NEC & Related Reference & Study Guides
 

Joined: Aug 2001
Posts: 599
N
Member

Joined: Oct 2000
Posts: 4,116
Likes: 4
Member
Thanks Nick!

[Linked Image]


Bill
Joined: Dec 2000
Posts: 4,294
Member
That Code will be defunct soon, as the State has made some changes... No more "inspector fetish" deals.
No "local stupid" changes can be made from the "California Electrical Code".
Of course LA will fight this to the end.
Their inspectors think that they look down on God. We're mere pawns in their "lunchtime" world.
Wooptedoo, I think their Code just ran out yesterday!!, along with a numerous bunch of silly municipalities.
AM I WRONG?
I think that I read something from the State of CA on 9-1-01, giving them 6 months to comply. It ran out yesterday. [Linked Image]



[This message has been edited by electure (edited 03-02-2002).]

Joined: Aug 2001
Posts: 599
N
Member
Yes Scott, all of California is supposed to use the CEC now. When total compliance will come about is anyones guess.

Joined: Oct 2000
Posts: 2,723
Likes: 1
Broom Pusher and
Member
Bill,

Oh ya - LA has it's own Codes. Building, Electrical, Mechanical, Plumbing, F/L/S, ADA, and such.
There's City of Los Angeles Codes, and County of Los Angeles Codes.

These are based on the California Codes - falling within "Title 24" [parts 1 thru 8].

I think San Diego also has their own Codes. I'm sure they have an Electrical Code [based on CEC / Title 24], but unsure if there's anything else.
They tend to restrict exterior Commercial Lighting to be LPS [Low Pressure Sodium]. The reasons I have heard are:
<OL TYPE=1>

[*]Reduction of Lighting Power - per Title 24 part 6 energy calcs,

[*]Reduction of Ambient light and resulting light distortions, per Palomar Observatory (Telescopes).
</OL>

As far as a Common use of the CEC, I can name one very commonly applied CEC item that all Electrical Contractors in California can relate to, along with Electrical Engineers involved with Commercial projects:

California Energy Conservation Calculations / Requirements!!! [AKA Title 24, part 6].

This translates [per Commercial projects] to:
  • Electronic Ballasts driving T8 lamps,
  • "Bi-Level" or "a/b" switching,
  • EMC's,
  • Bypass switches,
  • Energy Calcs on plansets,
  • Motion Sensors in Offices and such,
  • A maximum of 1.6 Watts per Square Foot of Lighting Power,
  • The old "Slave/Master" control for 3 lamp fixtures.


Scott SET


Scott " 35 " Thompson
Just Say NO To Green Eggs And Ham!

Link Copied to Clipboard
Powered by UBB.threads™ PHP Forum Software 7.7.5