ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Shout Box
Recent Posts
Explored: Basics of PLC
by niamishra. 10/19/18 04:44 AM
Linear Power Supply Quits Under Load
by JoeTestingEngr. 10/18/18 08:47 PM
220/230/240V 60Hz Systems
by dsk. 10/17/18 01:25 PM
PLC/HMI Enclosure C2, D1
by ghost307. 10/16/18 03:31 PM
New in the Gallery:
What is this for?
Plug terminals
Who's Online Now
1 registered members (JoeTestingEngr), 5 guests, and 25 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Page 1 of 2 1 2
Ya' gotta love it..... #63146
03/08/06 12:37 PM
03/08/06 12:37 PM
S
sparky 134  Offline OP
Member
Joined: Sep 2004
Posts: 91
Joliet, Il, USA
I received drawings from a GC for a residential remodeling project. The GC buys homes, remodels them and then sells them.

I sent the GC a list of questions concerning the job and if the property was open for inspection of existing conditions. He replied the property had been sold and the new owners are making some changes, hold off on bidding until further notice. Two days later I receive an email stating the changes are minor and please bid according to the existing drawings. Also, I really need the bid back TODAY !!!

I reply, "I need to visit the job to verify conditions."

He replies, "It will be open all day tomorrow."

So, I drive to the house, check the conditions, make my notes and drive back to the office and final my bid. Send the bid over to him and called today to follow up. He adds a couple of minor changes, I adjust my bid while on the phone and then he says, " I usually supply all material for the jobs."

So, I tell him I always supply my own material. He says, "Because you have a markup on the material."

I say, "Yes, and this prevents any problems with the material you supply being wrong."

He says, "But you will give me a list of the material and I will get it."

I say, "I have never allowed a customer to supply the material. I have a per device cost in my spreadsheet and after I enter all of the openings I have my price."

He says, "My budget price is $5000.00 for labor and no more than $4000.00 for material."

My price for the job was $10,285.00, a difference of $1,285.00. Then he adds, "Ya' know, I have a LOT of projects coming up. If I can find a contractor I can work with he could get a lot of business from me. I will compare your bid with the others I have received and I will get back to you."

At this point I am closing my spreadsheet because now I know I am wasting my time. I said, "If you should have any questions please don't hesitate to call."

What's next, they will supply all of the material AND part of the labor ?

Work Gear for Electricians and the Trades
Re: Ya' gotta love it..... #63147
03/08/06 02:21 PM
03/08/06 02:21 PM
K
kdal  Offline
Member
Joined: Sep 2005
Posts: 34
Florida,U.S.A.
Yep, and want another discount for offering to let you fish in his stocked pond.
The same jerk didn't want me to do trivial jobs like driving staples, putting on switch plates or putting the lamps and globes on light fixtures.
He said he would handle that.
I trimmed out using one bulb to test all the fixtures as I went.

Re: Ya' gotta love it..... #63148
03/08/06 05:47 PM
03/08/06 05:47 PM
S
Sparks30  Offline
Member
Joined: Mar 2002
Posts: 125
Connecticut.usa
I am lucky that no GC has tried to pull that on me. I have had H.O try that I told them that the job would cost more if they did any of the work, my name is still on the job if they put the outlet cover on and slipped on killed themselves. Next you know the other half is suing you because that was part of your job that you did not do. Even though they told you not to, courts normally will believe the H.O over a contractor.

Re: Ya' gotta love it..... #63149
03/08/06 06:43 PM
03/08/06 06:43 PM
L
LK  Offline
Member
Joined: Jan 2003
Posts: 1,429
New Jersey
Our plumber has an intresting way of dealing with remodel GC's, when they want to supply material, he says fine, we will supply labor you can pay the $750 day rate, and i need the check at the end of each working day, first check in advance, he claims a lot of them agree to this.

Re: Ya' gotta love it..... #63150
03/08/06 07:19 PM
03/08/06 07:19 PM
S
Surfinsparky  Offline
Member
Joined: Jul 2005
Posts: 73
merritt island fl usa
That's a damn good idea L.K. I like it.I get this a lot too.I love it when I do a service call and I hear they don't cost this much at home dump.I also say they do not sell this at home dump either.Nor do they have free delivery.

Re: Ya' gotta love it..... #63151
03/08/06 07:44 PM
03/08/06 07:44 PM
C
Celtic  Offline
Member
Joined: Feb 2005
Posts: 361
NJ
Quote

Then he adds, "Ya' know, I have a LOT of projects coming up.



Oh wow...where do I sign?


I had some bozo GC doing the same thing to me in South Jersey. He almost fainted when I told him he need a new service..that's when the "Ya' know..." converstation started.

GC - "Ya' know, I have a LOT of projects coming up."

Me - "Ya' know, I have a LOT of projects coming up, too...I don't need to do this for free".

I'm sure some trunk-slammer went and did the job and lost his shirt.


~~ CELTIC ~~
...-= NJ =-...
Re: Ya' gotta love it..... #63152
03/08/06 08:17 PM
03/08/06 08:17 PM
L
LK  Offline
Member
Joined: Jan 2003
Posts: 1,429
New Jersey
Celtic,

How about, we get some printed hand out pens, for GC's with, "Ya' know, I have a LOT of projects coming up." ?

Re: Ya' gotta love it..... #63153
03/08/06 08:35 PM
03/08/06 08:35 PM
D
Dave T  Offline
Member
Joined: Jan 2005
Posts: 155
Waukesha, WI, USA
Yes, part of our continuing education. How many times have you heard that if you give me a good price on this job you will get the next one. After cutting the pricing to the bare bones you never get the next job anyway.
Unless there are extenuating circumstances I learned to never bet on the come.

Re: Ya' gotta love it..... #63154
03/08/06 08:54 PM
03/08/06 08:54 PM
HCE727  Offline
Member
Joined: Nov 2005
Posts: 186
Delaware County, PA, USA
Like I said before in a previous post "Gotta, they won't let me say it, or is it me"?!


Hank
Re: Ya' gotta love it..... #63155
03/08/06 09:23 PM
03/08/06 09:23 PM
renosteinke  Offline
Cat Servant
Member
Joined: Jan 2005
Posts: 5,316
Blue Collar Country
Promises of "LOTS of future work" are meaningless. I have NEVER had any future work develop from folks who have said that.

I'm not running a charity. Chances are, the GC is better off financially than I, and ought to be the one to 'give me a break.'

So, my practice is, when someone makes that sort of offer....either I suddenly have a full schedule, and can't possibly work with him- or my prices go up at least 15%. For future price inquiries, I take my standard price and double it. I also give real serious thought to asking for half up front- and pull out the instant money is due.

I am an electrician, and a professional. I am not into playing games- especially with my bank balance.

Page 1 of 2 1 2

Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
HCE727
HCE727
Delaware County, PA, USA
Posts: 186
Joined: November 2005
Show All Member Profiles 
Top Posters(30 Days)
sparky 11
Popular Topics(Views)
250,477 Are you busy
188,047 Re: Forum
177,676 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.6.1
(Release build 20180101)
Page Time: 0.045s Queries: 15 (0.004s) Memory: 1.0266 MB (Peak: 1.2020 MB) Zlib enabled. Server Time: 2018-10-20 04:21:09 UTC