ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Shout Box
Recent Posts
sec cable code conflict
by gfretwell. 11/18/18 12:25 PM
This anti-theist is priceless!!!
by Texas_Ranger. 11/17/18 02:15 PM
High current GFI vs regular GFCI
by Texas_Ranger. 11/17/18 02:07 PM
Single phase and what you call it.
by dsk. 11/12/18 11:10 AM
New in the Gallery:
What is this for?
Plug terminals
Who's Online Now
0 registered members (), 27 guests, and 26 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Page 1 of 2 1 2
Air tight high hats #3801
08/29/01 10:29 PM
08/29/01 10:29 PM
S
silverbk  Offline OP
Member
Joined: Feb 2001
Posts: 60
I recently ran into some trouble with a tricky Town here.

Has anyone ever been required to install air tight recessed cans by a town or AHJ? Today the inspector failed my 6" IC rated cans and stated they need to be air tight. I have 15 years in the trade and work all over this county and have never heard anything like this before. As far as I know there is no energy code in force here like CA or WA.

Work Gear for Electricians and the Trades
Re: Air tight high hats #3802
08/30/01 05:01 AM
08/30/01 05:01 AM
S
sparky  Offline
Member
Joined: Oct 2000
Posts: 5,371
silverbk,

did he cite an NEC code violation? Or is this some building inspector?
[Linked Image]

Re: Air tight high hats #3803
08/30/01 07:07 AM
08/30/01 07:07 AM
electure  Offline

Member
Joined: Dec 2000
Posts: 4,276
Fullerton, CA USA
Are you working in a plenum ceiling?

We in CA aren't required by our incredibly strict energy regs to do that.

Re: Air tight high hats #3804
08/30/01 08:07 AM
08/30/01 08:07 AM
Bill Addiss  Offline
Member
Joined: Oct 2000
Posts: 3,903
NY, USA
Where are you located and what type of situation (Building, Construction etc) is this in?

Bill

Re: Air tight high hats #3805
08/31/01 07:55 AM
08/31/01 07:55 AM
J
JBD  Offline
Member
Joined: Jul 2001
Posts: 599
WI, USA
Some locations in Wisconcisn are requiring the use of air tight devices and boxes to prevent compromising the insulation system vapor barrier.

They have been rigid with the IC cans, but are still lax concerning the switch and recept boxes.

Re: Air tight high hats #3806
08/31/01 10:46 AM
08/31/01 10:46 AM
R
Redsy  Offline
Member
Joined: Mar 2001
Posts: 2,056
Bucks County PA
Quote
Originally posted by JBD:


They have been rigid with the IC cans, but are still lax concerning the switch and recept boxes.


Please, who makes "air tight" cans, or what renders a can airtight?

Re: Air tight high hats #3807
08/31/01 06:30 PM
08/31/01 06:30 PM
S
silverbk  Offline OP
Member
Joined: Feb 2001
Posts: 60
This is a residential setting ie a private house. There is no plenum. It is a sheet rock ceiling that will be insulated. This was by order of an electrical inspector from the New York Board of Fire Underwriters. The inspectors here apparently go along with whatever municipality or utility has juristiction.

Air tite recessed cans are nothing new they are available from most can manufacturers, they are however more expensive than ic and non-ic cans and are usually special order.

I am going to challenge the inspector to see why he is demanding this requirement. I am using ul listed ic rated cans and unless he is going to pull some kind of energy code on me they should suffice.

Re: Air tight high hats #3808
08/31/01 08:56 PM
08/31/01 08:56 PM
electure  Offline

Member
Joined: Dec 2000
Posts: 4,276
Fullerton, CA USA
Don't CHALLENGE the inspector. Simply and calmly ask him to cite the codes that you've violated. Then, if after going over the code sections together, come to a simple agreement. Do what is agreed on. A challenge is about the fastest way to PO an inspector.
Don't roll over, and don't back off if you're right, but do your homework before you call him down.

If the problem lies with the distance from insulation, they needn't be airtight, unless required by, like you say, another code. Any form of effective barrier should be OK in that case.





[This message has been edited by electure (edited 08-31-2001).]

Re: Air tight high hats #3809
09/07/01 07:05 AM
09/07/01 07:05 AM
R
Redsy  Offline
Member
Joined: Mar 2001
Posts: 2,056
Bucks County PA
I am finishing up a kitchen re-model that someone else started and was fired from. It is a one story addition (the opposite of the ceiling is the roof). The first contractor roughed-in hi-hat housings that have shoe box sized housings,(I believe MR-16 fixtures) I think they may be airtight. Maybe due to the ceiling being opposite the roof there is an energy issue. Is this an energy, or fire safety requirement?

Re: Air tight high hats #3810
09/07/01 04:41 PM
09/07/01 04:41 PM
S
sparky  Offline
Member
Joined: Oct 2000
Posts: 5,371
Redsy;
i couldn't find you a pix but this is from the RUUD lighting site;

New Airtight Recessed Cans
Recessed downlights can create open airways between temperature-controlled rooms and their uncontrolled attic or plenum spaces. Our new Insulated Ceiling Air Tight Recessed Downlights (ICAT Series) minimize air infiltration and leakage. This is especially important in states where codes require airtight recessed fixtures. Our ICAT Series is offered in three popular models, 4" Incandescent (R4ICAT), 6" Incandescent (R7ICAT) and 6" Fluorescent with 18W lamp (R7FICAT18). For other projects where direct contact with insulated ceiling materials may occur, use the 4" Low Voltage Incandescent (R4LICAT), 6" Economy Incandescent (R7EIC) or 6" Incandescent for remodel projects (R7RIC). If you choose to use another housing, be sure the insulation is at least 3" away from housing and junction box.


all they have different is a gasket around the trim hole, big !*&%$ deal! They are buried in insulation as it is. I also had an architect spec out vapor barior boxes once, they come with a little plastic flap. Being that i live up in the great white north i get this all the time, people retire here, build a post & beam streesskin home, insulated to R-346 to the point where the piolets go out in the stove and furnace due to lack of O2, and mama always has a headache...he**, a fart sticks around 3 days....but they save a whole 20% off normal construction fuel costs by god!
A few homes that i did like this came to the relization that they had a problem, so then they called in some NEW engineers that addressed the air exchanging, more ductwork etc...
There seems to be this manufacturing hype that drives this 'energy code' thing.....

Let 'em all go cut wood I say, maybe then they would'nt grow A***s the shapes of thier chairs an' stumble around for thier nitro everytime the doorbell rings
[Linked Image]

Page 1 of 2 1 2

Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
Trumpy
Trumpy
SI,New Zealand
Posts: 8,250
Joined: July 2002
Show All Member Profiles 
Top Posters(30 Days)
Admin 7
Popular Topics(Views)
251,575 Are you busy
188,727 Re: Forum
178,440 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.6.1
(Release build 20180101)
Page Time: 0.028s Queries: 15 (0.005s) Memory: 1.0261 MB (Peak: 1.2029 MB) Zlib enabled. Server Time: 2018-11-18 18:43:01 UTC