ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Do we need grounding?
by gfretwell - 04/06/24 08:32 PM
UL 508A SPACING
by tortuga - 03/30/24 07:39 PM
Increasing demand factors in residential
by tortuga - 03/28/24 05:57 PM
Portable generator question
by Steve Miller - 03/19/24 08:50 PM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
1 members (Scott35), 336 guests, and 30 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Page 2 of 2 1 2
BigB #222099 01/14/23 07:49 PM
Joined: Jan 2005
Posts: 5,445
Likes: 3
Cat Servant
Member
Ahh, you caught me!

I usually use Square D service panels from my local Square D carrying electrical house. Gray bar is an example. BUT ..

On my recent service change the local utility required a panel with a knife disconnect inside the utility portion. I was supplied with a Milbank panel with a Square D main. (According to Milbank that panel was required only by Amerindian (Missouri and southern Illinois).

Stay up to Code with the Latest NEC:


>> 2023 NEC & Related Reference & Exam Prep
2023 NEC & Related Reference & Study Guides

Pass Your Exam the FIRST TIME with the Latest NEC & Exam Prep

>> 2020 NEC & Related Reference & Study Guides
 

BigB #222102 01/19/23 10:10 AM
Joined: Apr 2002
Posts: 7,381
Likes: 7
Member
Reno:

Wasn't trying to catch ya, just looking at the pic I could not see any Sq D. (Was and still is my fav)


John
BigB #222107 01/27/23 10:52 PM
Joined: Jan 2005
Posts: 5,445
Likes: 3
Cat Servant
Member
You’re right, HotLine. I got sloppy and di- dn’t look closer at the pic. (I get any more senile I’ll have to try politics!)

Page 2 of 2 1 2

Link Copied to Clipboard
Powered by UBB.threads™ PHP Forum Software 7.7.5