ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat Box
Recent Posts
Vibrator Supplies??
by gfretwell - 10/19/19 08:33 PM
FPE in Germany
by NORCAL - 10/16/19 08:24 AM
Help with aging employee advice.
by Bill Addiss - 10/15/19 10:58 PM
Fuse blower plug?
by gfretwell - 10/13/19 03:23 PM
Power factor and transformer efficiency
by TeslaEdison - 10/13/19 04:05 AM
New in the Gallery:
FPE Breaker panel in germany
What is this for?
Who's Online Now
0 registered members (), 31 guests, and 10 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Page 2 of 3 1 2 3
Re: "Dry Run" Inspection goes awry [Re: NORCAL] #217582 09/03/16 11:28 PM
Joined: Nov 2000
Posts: 2,236
sparky66wv Offline OP
Member
Great question.

I would retreat! He was called first, so it is his baby.

I hope he is willing to pay "child support"! laugh

Last edited by sparky66wv; 09/03/16 11:32 PM.

-Virgil
Residential/Commercial Inspector
5 Star Inspections
Member IAEI
2017 / 2014 NEC & Related Books and Study Guides
Re: "Dry Run" Inspection goes awry [Re: sparky66wv] #217600 09/10/16 08:40 PM
Joined: Oct 2000
Posts: 5,383
S
sparky Offline
Member
I have to say the inspection side always looked like it required a lot of patience Virgil

It appears you've managed to find some, so go you!

~S~

Re: "Dry Run" Inspection goes awry [Re: sparky66wv] #217625 09/19/16 03:12 PM
Joined: Dec 2009
Posts: 18
E
emolatur Offline
Member
Would like to comment about the variation in thoroughness of inspections by comparing two here in Southern Maine. Different municipalities, different inspectors. I won't name either. Both jobs were interior renovations - new walls, new receptacles on old walls, new lighting. Both commercial (office space).

In the first, *everything* was critiqued. Ceiling tiles were moved, labeling was scrutinized, even things that were there long before I arrived were picked on (I was required to identify and label some transformers that weren't even associated with the same tenant, and had been there for 20+ years...)

Different location, 15 miles distance per Google, one year later -- bigger job twofold -- guy walks in, looks at one outlet and one junction box, suggests I add another EXIT sign, and is done.



The classic "new service" residential inspection in my home town, further north, is done by the power company, as there is no local inspector. This may have changed, as I haven't done work up there in some ten years, but last time I did, the whole thing was basically, "main breaker? check. ground rod(s)? check. no gargantuan flameballs when we plug the meter in? check. you're good, have a nice day."

Re: "Dry Run" Inspection goes awry [Re: sparky66wv] #217626 09/19/16 11:17 PM
Joined: Jul 2004
Posts: 9,409
G
gfretwell Online Content
Member
I used to like climbing ladders to see the stuff they thought I would not be looking at. (removing covers etc) That will give you a better idea about the things they plan for you to look at. Covering 5 counties, my travel time could be 3 hours so it seemed silly to me to do a drive by inspection. Besides I just like looking at stuff and working for the state, they had some cool stuff. wink


Greg Fretwell
Re: "Dry Run" Inspection goes awry [Re: sparky66wv] #217629 09/20/16 09:13 AM
Joined: May 2005
Posts: 984
G
ghost307 Offline
Member
I knew 1 'inspector' who joked that he slowly drove past the site. If there were no visible smoke or flames he would sign off on it.


Ghost307
Re: "Dry Run" Inspection goes awry [Re: sparky66wv] #217632 09/20/16 01:12 PM
Joined: Jul 2004
Posts: 9,409
G
gfretwell Online Content
Member
During the housing boom (2004-5) drive by inspections were not that rare. Guys were leaving the shop with 40+ cards in their pocket spread out across the whole county. There was barely time enough to sign the permits and drive to the next one. I was happy to miss that mess. By then I was out but I did have offers to be a contract guy for an engineering company doing 1&2 family. I passed.


Greg Fretwell
Re: "Dry Run" Inspection goes awry [Re: sparky66wv] #217637 09/20/16 08:15 PM
Joined: Nov 2002
Posts: 788
W
wa2ise Offline
Member
Some inspectors may figure that if they inspect one random house out of 20 done by the same electrical contractor, and find no problems at the random house, he'll figure all the houses are good and pass them all.

Re: "Dry Run" Inspection goes awry [Re: sparky66wv] #217638 09/20/16 10:39 PM
Joined: Apr 2002
Posts: 7,121
HotLine1 Online Content
Member
Personally, "drive bys" at the end of the day do not do anybody good.

If I ever left the office with 40 cards spread over the 32 sq. miles of the Twp., it would be a very, very long day. Again, the 'load' depends on what the jobs are, and IF they are 'all over'. We had a 'flash' guy back a few years that said he has a 'sticker gun'!! He didn't last to long.

A good day at the ranch is 10-12 each for my inspectors (2) and 6-9 for me. On a 'bad day' when I'm the 'lone ranger' it supposed to cap out at 14.

FYI, doing one unit out of 20 could result in some serious issues with the DCA here in NJ.



John
Re: "Dry Run" Inspection goes awry [Re: NORCAL] #217718 10/31/16 09:05 PM
Joined: Nov 2000
Posts: 2,236
sparky66wv Offline OP
Member
It was the Sunday before he was scheduled the next day, so no danger in that.


-Virgil
Residential/Commercial Inspector
5 Star Inspections
Member IAEI
Re: "Dry Run" Inspection goes awry [Re: sparky66wv] #217719 10/31/16 09:11 PM
Joined: Nov 2000
Posts: 2,236
sparky66wv Offline OP
Member
I must say that I have learned a lot with this new experience, and have found myself wanting to be more an educator than an enforcer. My repeat ECs are learning what I like to see and the Joe Homeowners get some free advice, and as long as we can resolve those issues within 24 hours, I'll put an approved sticker on it and withhold the Cut-In-Card until I have seen pics texted to me of the issues I have specified being resolved. It it a way to make the installation pass without having to fail them. Go technology.

Last edited by sparky66wv; 10/31/16 09:14 PM.

-Virgil
Residential/Commercial Inspector
5 Star Inspections
Member IAEI
Page 2 of 3 1 2 3

Featured:

2020 National Electrical Code
2020 National Electrical
Code (NEC)

* * * * * * *

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
Posts: 362
Joined: April 2003
Show All Member Profiles 
Top Posters(30 Days)
sparky 10
Popular Topics(Views)
259,745 Are you busy
195,070 Re: Forum
184,480 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.7.3