ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals

>> Home   >> Electrical-Photos   >> Classifieds   >> Subscribe to Newsletter   >> Store  
 

Photo of the Week:

Delco-Light Generator
 Delco-Light Generator

Advertisement:-Left
Recent Gallery Topics:
What in Tarnation?
What in Tarnation?
by timmp, September 10
Plumber meets Electrician
Plumber meets Electrician
by timmp, September 10
Who's Online Now
1 members (Scott35), 31 guests, and 13 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
#212657 01/30/14 01:00 PM
Joined: Jul 2004
Posts: 136
C
cgw Offline OP
Member
For a conduit installed for data cable (e.g. conduit from wall box up to above ceiling) - What should the minimum radius of the elbow be?

Horizontal Ad
Joined: Mar 2004
Posts: 251
W
Member
4 times the diameter of the cable is the min, for regular bends 50mm is the min.

Joined: Jun 2004
Posts: 1,273
T
Member
Radius in such situations is almost never an issue.

The crippler is the size of the conduit.

Typical minimum for trivial need: 3/4"

Robust data-com spec out 1 1/4" drops -- for which j-boxes are in mass production (yet special order from your distributor -- such big KOs have to be spec'd) (4-11s)

It's not uncommon for the drops to have no elbow at all. Instead, the drop is a sleeve capped by a plastic bushing -- typically a white nylon style -- Arlington pitches theirs all the time in EC Magazine.

It's common for the spec's to call out for bushed entries, BTW. Bare pipe won't do.

%%%%

Eriksen sells a bender that kicks out mild sweeps in EMT.

It's popular in the data-com world, too.

http://www.ericksenbender.net/

This is usually a company tool. Its sweeps are so gentle that it's possible to go to down a size for data-com sweeps. (ie, 1" replaces 1 1/4") If you do this often enough, then the bender pays for itself.

[ Note: downsizing data-com drops is only possible if you've got the data-com contract. In all other cases, you're in the blind -- and will have to follow the contract spec's. These are usually worked up on the most conservative (oversized) basis so that the writer doesn't get bit by final results.]

%%%

In all cases, never attempt to get away with 1/2" EMT.

%%%


Last edited by Tesla; 01/30/14 07:17 PM.

Tesla

Link Copied to Clipboard
Advertisement:-Right


Tools for Electricians
Tools for Electricians
 

* * * * * * *
2023 National Electrical Code (NEC)
2023 NEC + Exam Prep Study Guides Now Available!
 

Member Spotlight
renosteinke
renosteinke
Blue Collar Country
Posts: 5,474
Joined: January 2005
Top Posters(30 Days)
BigB 6
Popular Topics(Views)
329,675 Are you busy
254,524 Re: Forum
237,009 Need opinion
New Page 2
Powered by UBB.threads™ PHP Forum Software 7.7.5