I have not checked the Primary fuse size, but I will. The Bldg. is only 2 years old, and the original design should of had 3 circuits to the cubicle sections. there are 2 sections we will be running an additional circuit to each. Learned a few things about cubicle pre-fab modular wiring on this one. Think I'll open a Sam Adams cold one.