May I suggest reading the install instructions/directions, and/or specs from the mfg.
Also, do you have plans/specs for the job? The EE/PE/Arch should have addressed this, or it should have been a note in Plan Review for the permit.
IMHO, GF protection, although the 'tile' floor is nor specifically stated in the NEC should be installed. Personally, I would install GF.