ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Recent Posts
Chinese motors rated 220 v 50 hertz
by gfretwell - 07/23/24 04:45 PM
100 Definitions: Accessible 2023
by gfretwell - 07/23/24 10:12 AM
100 Definitions, Likely to Become Energized, 2023
by gfretwell - 07/23/24 10:08 AM
240V only in a home and NEC?
by emolatur - 07/18/24 01:05 PM
2023 CEU Course
by gfretwell - 07/17/24 01:08 AM
Advertisement:-Left
Recent Gallery Topics:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
0 members (), 211 guests, and 32 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Joined: Mar 2003
Posts: 849
Y
Member
Hospital Transfer switch and Panels Em system under 150 KVA.
Critical System = Seperate panel, Seperate Conduits and wire.
No mixing with other systems.
Lifesafety system = Same
Equipment System = Same
At no time can theses three systems share and panels or raceways of the others.(expect as noted in 517-30 c (1)
Opinions Please

Horizontal Ad
Joined: May 2002
Posts: 1,716
R
Member
Ernie, this is true.

There should be no problem in compliance if the job is planned.

The three Essential system branches are pretty much aligned with articles 700, 701, and 702 if you think about it.

Roger

Joined: Mar 2005
Posts: 1,213
S
Member
The equipment system can share raceways, etc, with nonessential loads. Critical and life safety must be segretated, though.


Link Copied to Clipboard
Advertisement:-Right

* * * * * * *
Tools for Electricians
Tools for Electricians
 
* * * * * * *

2023 National Electrical Code (NEC)
2023 NEC + Exam Prep Study Guides Now Available!

Member Spotlight
JoeKP
JoeKP
Berkley, MA
Posts: 144
Joined: March 2008
Top Posters(30 Days)
Popular Topics(Views)
323,572 Are you busy
247,890 Re: Forum
231,670 Need opinion
New Page 2
Powered by UBB.threads™ PHP Forum Software 7.7.5