ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Shout Box
Recent Posts
diazed fuses
by Texas_Ranger. 02/21/18 10:22 AM
110.26
by gfretwell. 02/18/18 12:14 AM
2018 Code Explained
by Potseal. 02/14/18 03:16 PM
New in the Gallery:
Housebilding DIY wiring
SE cable question
Who's Online Now
0 registered members (), 20 guests, and 10 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Access control #168817
09/16/07 02:18 PM
09/16/07 02:18 PM
S
sawdust454  Offline OP
Member
Joined: Mar 2005
Posts: 20
Waynesboro, Va USA
Anybody here install access control systems? Specifically Honeywell pass point plus. I have an ademco 6139 keypad that I cannot clear the open circuit fault, despite the fact I have entered the correct code of 00 and every other code up to code 31. The main logic board on this system cannot be communicated with by my pc. This all occured after updating the firmware, which completed correctly. any help is appreciated.
Thanks
Ron

Work Gear for Electricians and the Trades
Re: Access control [Re: sawdust454] #168820
09/16/07 11:09 PM
09/16/07 11:09 PM
W
WESTUPLACE  Offline
Member
Joined: Mar 2004
Posts: 251
Kingwood, TX USA
I work on both Passpoint Express & Plus. Do you have no communication with the computer (connection fails) you may need to do a full reset. Is the fault in the com between the panel and the computer? Just replaced a power supply board on a panel, lost one of 2 voltages. also had com problems. Honeywell customer service is good, they will give you help, just may take a while to get tech assist on the phone. Is


Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
Vlado
Vlado
Croatia
Posts: 28
Joined: February 2011
Show All Member Profiles 
Top Posters(30 Days)
Admin 8
Popular Topics(Views)
244,046 Are you busy
181,038 Re: Forum
171,281 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.6.1
(Release build 20180101)
Page Time: 0.014s Queries: 15 (0.003s) Memory: 0.9415 MB (Peak: 1.0589 MB) Zlib enabled. Server Time: 2018-02-21 20:55:51 UTC