When I first got started in residential work, I called the PoCo before the first service upgrade I did, to have them come out to disconnect the service drop and pull the meter.
I was asked by the person on the phone if there was some reason I couldn't do it myself!
![[Linked Image]](https://www.electrical-contractor.net/ubb/smile.gif)
I've been doing it myself ever since, without even bothering to call. I cut the overhead drop conductors and the meter seal myself, pull and reset the meter, and reconnect the service drop to the new entrance conductors. Generally, I will take the seal I cut off, and hang it on the new meter pan with a business card.
After the inspection is complete, the PoCo comes back to make permanent connections, and reseals the meter at that time. Have done it this way for several years now, and no complaints yet. About the only time I call the utility now is when the meter is sealed with one of their high-security "barrel locks", which needs a special tool for removal. These generally seem to be installed in more urban areas, with the usual arrangement being a simple plastic/wire tag or pressed lead seal.
Does anyone know of a source for one of those special tools? It would save a lot of hassle from time to time. The utility usually only gives a estimate on a service call time (somewhere in a 4-6 hour period!), and usually will not unlock the meter in advance of my arrival.
![[Linked Image]](https://www.electrical-contractor.net/ubb/frown.gif)
A real PITA when you want to get a job started early and end up waiting on the PoCo crew for several hours....