ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat Box
Recent Posts
Questioning the electrical norms
by HotLine1 - 03/04/21 12:35 PM
Lock-down Thread
by gfretwell - 03/03/21 12:38 PM
Northern Tool Recalls Powerhorse Generators
by Admin - 02/25/21 09:49 PM
You will never guess
by gfretwell - 02/25/21 07:48 PM
New in the Gallery:
Facebook follies, bad wiring
FPE in Germany pt.2
Who's Online Now
1 registered members (Scott35), 16 guests, and 23 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Bent 33kV Pole Extension (NZ) #166509 07/22/07 06:39 PM
Joined: Jul 2002
Posts: 8,379
Trumpy Offline OP
Member
Pics and info submitted by RODALCO:
Quote
Here are two pics of bent powerpoles in Glenfield, still in service after the weatherbomb from July 10th.
33 kV over 11 kV. over 230 / 400 Volts and pilots.
These are standard concrete poles with steel extensions which got bent in the storm.


[Linked Image]


[Linked Image]



Thanks Ray! smile

Tools for Electricians:
Re: Bent 33kV Pole Extension (NZ) [Re: Trumpy] #166520 07/23/07 03:47 AM
Joined: Aug 2001
Posts: 7,520
P
pauluk Offline
Member
Quote
33 kV over 11 kV over 230 / 400 Volts

Now that's something you just don't see here. It's rare to even see 11kV and 240/415 running together on the same poles (except for the one pole where they meet at a xfmr, of course).

Re: Bent 33kV Pole Extension (NZ) [Re: pauluk] #166523 07/23/07 05:07 AM
Joined: Dec 2005
Posts: 860
R
RODALCO Offline
Member
Pauluk
In New Zealand it is very common to find LV (230/400Volts) underneath 11, 22, 33 and even 110 kV lines.
Ok, the risk exists that when an HV line breaks it will do damage to the LV network which occasionally happens.

We had a bad storm over the North Island July 9 th, which knocked out power to about 110,000 customers in Northern parts of Auckland to Wellsford.
Many 11 and 33 kV lines were down where trees had fallen across them or flooding caused slips.
While getting scada problems sorted out in the substations i came along these bent extensions, i quickly took some photo's and logged a job for repair. These poles are still in service at the moment 2 weeks later. It looks that a bolt has snapped off at one side of the pole and the steel extension just bend over, not a healthy sight though.
The 12 hour design rating of the 24 volt scada batteries was not enough to keep the comms going so i ended also up putting in temporary generators to recharge the discharged batteries.
The 110 Volt banks stood up well during the storm, comms was lost hence no remote switching was possible.


The product of rotation, excitation and flux produces electricty.

Featured:

2020 National Electrical Code
2020 National Electrical
Code (NEC)

* * * * * * *

2020 Master Electrician Exam Preparation Combos
2020 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
watersparkfalls
watersparkfalls
Washington...Not DC
Posts: 236
Joined: March 2005
Show All Member Profiles 
Top Posters(30 Days)
Popular Topics(Views)
275,745 Are you busy
209,659 Re: Forum
197,004 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.7.3