ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Top Posters(30 Days)
dsk 13
Admin 5
Recent Posts
electircal ageing test on IPC
by SIAME. 08/15/17 02:43 AM
electrical aging test on IPC
by gfretwell. 08/15/17 12:27 AM
Bathroom electrical
by gfretwell. 08/14/17 02:05 AM
"Line level" audio on Cat 5?
by gfretwell. 08/08/17 10:39 PM
Fire alarm phone lines and color coding
by gfretwell. 08/08/17 10:26 PM
New in the Gallery:
Housebilding DIY wiring
Popular Topics(Views)
239,854 Are you busy
175,409 Re: Forum
167,700 Need opinion
Who's Online Now
0 registered members (), 41 guests, and 9 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate This Thread
#161951 - 04/10/07 04:25 PM specs or drawings  
GETELECTRIC  Offline
Member
Joined: Oct 2003
Posts: 172
toronto canada
I have a job where the drawings conflict with the specs.What takes precedent or as usual is it going to be a fight.


Business, Office, Estimating, Legal:

#161956 - 04/10/07 05:07 PM Re: specs or drawings [Re: GETELECTRIC]  
ITO  Offline
Member
Joined: Nov 2006
Posts: 348
Texas
Specs take precedent over drawings.

More specifically each plan page takes precedent over the previous page, until the last page then the specs take precedent and follow the same rule with the last spec page taking precedent over everything.

Unless the specs are printed on a plan page, then its gets tricky.

At least this is how it works when you take it to court.

Last edited by ITO; 04/10/07 05:08 PM.

101° Rx = + /_\

#161979 - 04/11/07 07:47 AM Re: specs or drawings [Re: ITO]  
Ron  Offline
Member
Joined: Mar 2002
Posts: 582
White Plains, NY
I know of no precedent of one over the other unless stated specifically in one of the documents.


Ron

#162224 - 04/14/07 10:23 PM Re: specs or drawings [Re: GETELECTRIC]  
e57  Offline
Member
Joined: May 2003
Posts: 2,876
S.F.,CA USA
Started the job already? While there was a conflict in them? RFI and price accordingly for the change to what you submitted - unless the change is dramatic there should not be a problem. Otherwise, I would tend to think the spec's would have presidence over plans. Either way it sounds like there are too many cooks in the kitchen.


Mark Heller
"Well - I oughta....." -Jackie Gleason


Member Spotlight
sparky66wv
sparky66wv
West Virginia
Posts: 2,236
Joined: November 2000
Show All Member Profiles 
Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Shout Box
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.012s Queries: 15 (0.003s) Memory: 0.7608 MB (Peak: 0.8944 MB) Zlib enabled. Server Time: 2017-08-16 13:29:47 UTC