ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Shout Box
Recent Posts
Calling all Non-US members!! (Non-US only)
by HotLine1. 06/13/18 01:50 PM
GE Lighting Recalls LED Tube Lamps
by Admin. 06/12/18 09:32 PM
Ketra Recalls Recessed Downlights
by Admin. 06/12/18 09:17 PM
diazed fuses
by Texas_Ranger. 06/11/18 07:31 AM
soda can fuse from UK, facebook
by wa2ise. 06/06/18 11:02 PM
New in the Gallery:
Plug terminals
Housebilding DIY wiring
Who's Online Now
0 registered members (), 37 guests, and 25 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
specs or drawings #161951
04/10/07 04:25 PM
04/10/07 04:25 PM
G
GETELECTRIC  Offline OP
Member
Joined: Oct 2003
Posts: 172
toronto canada
I have a job where the drawings conflict with the specs.What takes precedent or as usual is it going to be a fight.

Business, Office, Estimating, Legal:
Re: specs or drawings [Re: GETELECTRIC] #161956
04/10/07 05:07 PM
04/10/07 05:07 PM
I
ITO  Offline
Member
Joined: Nov 2006
Posts: 348
Texas
Specs take precedent over drawings.

More specifically each plan page takes precedent over the previous page, until the last page then the specs take precedent and follow the same rule with the last spec page taking precedent over everything.

Unless the specs are printed on a plan page, then its gets tricky.

At least this is how it works when you take it to court.

Last edited by ITO; 04/10/07 05:08 PM.

101° Rx = + /_\
Re: specs or drawings [Re: ITO] #161979
04/11/07 07:47 AM
04/11/07 07:47 AM
R
Ron  Offline
Member
Joined: Mar 2002
Posts: 582
White Plains, NY
I know of no precedent of one over the other unless stated specifically in one of the documents.


Ron
Re: specs or drawings [Re: GETELECTRIC] #162224
04/14/07 10:23 PM
04/14/07 10:23 PM
E
e57  Offline
Member
Joined: May 2003
Posts: 2,876
S.F.,CA USA
Started the job already? While there was a conflict in them? RFI and price accordingly for the change to what you submitted - unless the change is dramatic there should not be a problem. Otherwise, I would tend to think the spec's would have presidence over plans. Either way it sounds like there are too many cooks in the kitchen.


Mark Heller
"Well - I oughta....." -Jackie Gleason

Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
HCE727
HCE727
Delaware County, PA, USA
Posts: 186
Joined: November 2005
Show All Member Profiles 
Top Posters(30 Days)
twh 5
Popular Topics(Views)
247,587 Are you busy
184,921 Re: Forum
174,147 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.6.1
(Release build 20180101)
Page Time: 0.024s Queries: 15 (0.005s) Memory: 0.9599 MB (Peak: 1.0931 MB) Zlib enabled. Server Time: 2018-06-19 18:20:50 UTC