ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Increasing demand factors in residential
by gfretwell - 03/28/24 12:43 AM
Portable generator question
by Steve Miller - 03/19/24 08:50 PM
Do we need grounding?
by NORCAL - 03/19/24 05:11 PM
240V only in a home and NEC?
by dsk - 03/19/24 06:33 AM
Cordless Tools: The Obvious Question
by renosteinke - 03/14/24 08:05 PM
New in the Gallery:
This is a new one
This is a new one
by timmp, September 24
Few pics I found
Few pics I found
by timmp, August 15
Who's Online Now
1 members (Scott35), 248 guests, and 18 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
#160553 10/12/06 11:49 PM
Joined: Oct 2004
Posts: 14
W
Member
I recently agreed to upgrade an existing Cat5 network to a certified Cat6 network including a new cabinet and patch panel. It's done but it took me way too long for various reasons. It's been a long time since I did a network. It was a per hr. job, but that wouldn't be fair to the customer now. I'm trying to find the average rate per certified drop, so I can calculate a fair billing. What do you charge per drop? I was recently told that $200 is the norm.
RAW

Stay up to Code with the Latest NEC:


>> 2023 NEC & Related Reference & Exam Prep
2023 NEC & Related Reference & Study Guides

Pass Your Exam the FIRST TIME with the Latest NEC & Exam Prep

>> 2020 NEC & Related Reference & Study Guides
 

#160554 10/13/06 08:38 AM
Joined: Jan 2005
Posts: 135
M
Member
There are far too few details given.
Is it all in conduit, wiremold?
Are you dealing with a 200 year old NYC building ?
Is it newer construction?
Did you include a pathway system ?
If so what kind of pathway system ?
What quality of cable and hardware did you use ?
Does this include all the configuration of routers and switches?
Were all the runs at maximum length or were they all 50' runs ?
How many cables are we talking here?
Were they all single location or quad drops ?
How did you certify the job ?
Any pics of this project ?

#160555 10/13/06 11:13 AM
Joined: Oct 2004
Posts: 14
W
Member
Sorry I didn't realize all the variables.

Is it all in conduit, wiremold? NO
Are you dealing with a 200 year old NYC building ? NO
Is it newer construction? 15 YEARS
Did you include a pathway system ? NO
If so what kind of pathway system ? NO
What quality of cable and hardware did you use ? BELDEN CAT6 - PANDUIT PATCH AND RJ-45
Does this include all the configuration of routers and switches? NO, JUST CABLE, CABINET, PATCH PANEL, AND TERMINATE EACH END.
Were all the runs at maximum length or were they all 50' runs ? 50' TO 90'AVG.
How many cables are we talking here? 24
Were they all single location or quad drops ? SINGLE
How did you certify the job ? BORROWED A FLUKE CERTIFIER (man that thing is intense!)
Any pics of this project ? NO. IMAGINE A DOCTORS OFFICE WITH A DROPPED CEILING. HAD TO DO IT AFTER HOURS.

THE THING THAT TOOK SO LONG WAS THAT THE TRUSSES WERE 8' ABOVE THE GRID, AND THERE WAS ROMEX ALL OVER THE PLACE SECURED TO TIE WIRE A FEW INCHES ABOVE THE GRID. STEEL STUD WALLS. WE PUT THE CABLE UP ON THE TRUSSES TO GET IT AWAY FROM ALL THAT ROMEX, AND LAY IN LIGHTS.

#160556 10/13/06 12:06 PM
Joined: Dec 2003
Posts: 886
H
Member
Romex above a commercial hung ceiling? OUCH!

Anyway, as to what to charge you already know what the costs are. If you can honestly say that you utilized the hours you spent on the job what's the problem? There is a lot going on here, certification, high trusses and did you remove the old stuff?

-Hal