ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Shout Box
Recent Posts
by gfretwell. 03/24/18 02:10 AM
Recall Notice Kidde Smoke Alarms
by dougwells. 03/22/18 01:40 PM
Recall notice: Southwire wi-fi wall switches
by sparkyinak. 03/15/18 06:03 PM
Goodman Manufacturing Recalls Modular Blowers
by Admin. 03/13/18 10:40 PM
New in the Gallery:
Housebilding DIY wiring
SE cable question
Who's Online Now
0 registered members (), 6 guests, and 9 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Remodel #159268
11/18/06 08:31 PM
11/18/06 08:31 PM
Sparks30  Offline OP
Joined: Mar 2002
Posts: 125
Question is ,what is a good price for this, all devices are old work. I can only channel for drilling joist.

5-5" Recessed lights in kitchen controlled from 2 different switches.
Under cabinet lights controlled from 2 different switches.
Remove and reroute wires in wall for new garage door.
Bring kitchen outlet up to code. ( wall spacing and circuits)
Refrige on it's own circuit to generator panel.
Micohood on it's own circuit to generator panel.
Dishwasher on dedicated circuit to regular panel.
1-4" Recessed light on switch for over the sink.
Rewire garbage disposal to meet code. ( single pole )
Install programmable T-stat.
Replace existing range wire and outlet to meet code. ( 60ft )
Remove and replace light at top of stairs with recessed light. ( Limited working space )
Dedicated outlet for fireplace. ( Gas )
New outlet for flat sceen TV over fireplace.
New cable outlet for TV over fire place.
Install multiple smoke and co detectors on dedicated circuit. ( 5-6 )

Business, Office, Estimating, Legal:
Re: Remodel #159269
11/18/06 11:47 PM
11/18/06 11:47 PM
Trick440  Offline
Joined: Aug 2005
Posts: 248
Waterford, MI, USA
I think that would be very hard for anyone on here to price that out without seeing the job.

Is there drywall up? Is there a basement, attic access? How dirty and how much crap is in the way?

If there is no drywall in the way I would say atleast around $1800+ material. Or whatever you charge for 3 full days.

[This message has been edited by Trick440 (edited 11-18-2006).]

Shake n Bake
Re: Remodel #159270
11/19/06 09:10 AM
11/19/06 09:10 AM
Sparks30  Offline OP
Joined: Mar 2002
Posts: 125
Little crawl space about 2 ft wide around the back side of house. And all sheetrock on ceiling to remain. Panel is in gaage with open ceiling. Basement is open.

[This message has been edited by Sparks30 (edited 11-19-2006).]


2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman


Member Spotlight
Bakersfield, CA (Originally Orange Co.)
Posts: 1,431
Joined: February 2004
Show All Member Profiles 
Top Posters(30 Days)
Admin 5
Trumpy 5
Popular Topics(Views)
244,888 Are you busy
182,000 Re: Forum
172,033 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.6.1
(Release build 20180101)
Page Time: 0.017s Queries: 14 (0.003s) Memory: 0.9510 MB (Peak: 1.0744 MB) Zlib enabled. Server Time: 2018-03-24 09:46:43 UTC