ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Shout Box
Recent Posts
diazed fuses
by annemarie1. 02/24/18 08:05 PM
Solid state relay or not
by gfretwell. 02/24/18 04:52 AM
Whirlpool Recalls KitchenAid Electric Kettles
by Admin. 02/22/18 11:35 AM
110.26
by gfretwell. 02/18/18 12:14 AM
New in the Gallery:
Housebilding DIY wiring
SE cable question
Who's Online Now
0 registered members (), 3 guests, and 7 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Sq' pricing #159076
10/20/06 08:06 PM
10/20/06 08:06 PM
S
Sparks30  Offline OP
Member
Joined: Mar 2002
Posts: 125
Connecticut.usa
Talked to a GC today. Ihave not seen him in years. We were talking he asked me what I charge for sq ft on new construction. I have not done that kind of pricing before. Normally look at prints and give price from there. Any help on what to include on this, like service, cans,uc lighting.This is in CT. Thanks Sam

Business, Office, Estimating, Legal:
Re: Sq' pricing #159077
10/20/06 09:27 PM
10/20/06 09:27 PM
T
Trick440  Offline
Member
Joined: Aug 2005
Posts: 248
Waterford, MI, USA
Go through your paperwork on old houses and get the average sq. ft price.

Ussually when I do it. Its the 'wired to code' price, no extras. Recess, wells, uc lgts ect. all at additional prices.

I havent done it in awhile, last time I did was when copper was at its max price I think I was using around $2.5 sq. ft... lower copper price was 2.2 .. I could be off been awhile


Shake n Bake
Re: Sq' pricing #159078
10/21/06 07:07 AM
10/21/06 07:07 AM
S
Sparks30  Offline OP
Member
Joined: Mar 2002
Posts: 125
Connecticut.usa
That seems kind of low. At almost $90.00 for 12-2RX and $130.00 14-3 RX. Material alone would run about $2000.00 not including a service.

Re: Sq' pricing #159079
10/23/06 10:08 PM
10/23/06 10:08 PM
T
Trick440  Offline
Member
Joined: Aug 2005
Posts: 248
Waterford, MI, USA
Yup, might be low I just did a quick figure.
2200sq.ft
$3000 material
<48 man hrs.
$52 an hour.

residential production sucks... better upsell em.


[This message has been edited by Trick440 (edited 10-23-2006).]


Shake n Bake
Re: Sq' pricing #159080
10/23/06 11:40 PM
10/23/06 11:40 PM
W
wis-sparky  Offline
Member
Joined: Jul 2005
Posts: 16
Wisconsin
48 man hours for 2200 square - hate to compete against that - what do you figure on the trim?

Re: Sq' pricing #159081
10/24/06 05:21 AM
10/24/06 05:21 AM
S
Sparks30  Offline OP
Member
Joined: Mar 2002
Posts: 125
Connecticut.usa
What I can up with is about $7.40 a sq ft.
Figure 2 guys
total 80 manhours
plus $3000 material.
@$65.oo per man

Re: Sq' pricing #159082
10/24/06 01:29 PM
10/24/06 01:29 PM
T
Trick440  Offline
Member
Joined: Aug 2005
Posts: 248
Waterford, MI, USA
We have 2 guys finish up to 3000sq ft in 16-20 man hrs.

Now throw in a few cieling fans and a couple complex chandeliers and its longer.

[This message has been edited by Trick440 (edited 10-24-2006).]


Shake n Bake
Re: Sq' pricing #159083
10/24/06 09:02 PM
10/24/06 09:02 PM
T
trevman  Offline
Member
Joined: Aug 2005
Posts: 47
canada
I did a house recently and bid per sq ft at 4.50 to min code requirements. 1800 sq ft. I spent more time there than i would like to say, and barely made 4000.00 guys are doing houses for to cheap where i live


Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
watersparkfalls
watersparkfalls
Washington...Not DC
Posts: 222
Joined: March 2005
Show All Member Profiles 
Top Posters(30 Days)
Admin 9
Popular Topics(Views)
244,084 Are you busy
181,127 Re: Forum
171,323 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.6.1
(Release build 20180101)
Page Time: 0.027s Queries: 14 (0.004s) Memory: 0.9908 MB (Peak: 1.1502 MB) Zlib enabled. Server Time: 2018-02-25 15:44:10 UTC