ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
Shout Box
Recent Posts
220/230/240V 60Hz Systems
by gfretwell. 09/23/18 02:50 PM
Inspection camera help
by petey_c. 09/22/18 07:52 AM
Motion detectors and dimmers
by gfretwell. 09/20/18 04:02 PM
Extension cords
by annemarie1. 09/20/18 08:54 AM
Acronis Backup 2017
by gfretwell. 09/16/18 12:46 AM
New in the Gallery:
Plug terminals
Housebilding DIY wiring
Who's Online Now
0 registered members (), 3 guests, and 27 spiders.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
Job Site Inspection?? #158020
03/20/06 04:09 AM
03/20/06 04:09 AM
Trumpy  Offline
OP
Member
Joined: Jul 2002
Posts: 8,247
SI,New Zealand
Guys,
I'm wondering.
If you are going to price a future job, what sort of things do you look for at that site?.
I've done this sort of work before and I can't but feel, I'm missing some of the things I should be looking at.
Anyone care to comment?.

Business, Office, Estimating, Legal:
Re: Job Site Inspection?? #158021
03/20/06 07:56 PM
03/20/06 07:56 PM
renosteinke  Offline
Cat Servant
Member
Joined: Jan 2005
Posts: 5,316
Blue Collar Country
When I look at a jobsite, there are a few things that come to mind.
The first is the style of construction- just what obstacles are likely to interfere with the work? Has a lot of work been done by unqualified folks already?
Then there is the presence -or absence- of 'services.' That is, is there a trash dumpster, working toilet, break room, parking lot, elevator, etc.....in addition to whether the power will be available during the job.
Access is a concern. Will the place be open for business during our work? Can we work "after hours?"

The last question is "who else will I be working with?" Depending upon the other trades involved, the job can be a dream....or a nightmare!

Re: Job Site Inspection?? #158022
03/22/06 07:10 PM
03/22/06 07:10 PM
Scott35  Offline

Broom Pusher and
Member
Joined: Oct 2000
Posts: 2,708
Anaheim, CA. USA
Depends on the parameters of the project (the type of project - New, Remodel, etc.).

My answers are bent towards Commercial / Industrial, which may be of no assistance to those in the Forum whom deal with Residential.

* Project - New Work / New Construction (unimproved lot):
Preliminary survey of site; looking for locations of Temp Power / Voice line, and best placement of Materials for Storage, overall ground conditions and related stuff.
Not very much needed to field verify on a completely new project.

* Project - Tenant Improvements, Additions and Remodels:
Prelim. survey of existing conditions regarding demolition and continuity of other Tenant spaces' Power + Comm., existing Electrical Equipment information (maker, ratings, distances, available space, location, etc.), amount of sawcutting involved, what needs to be matched to fit / look original, Asbestos abatement, existing systems and/or equipment to remain as-is, type of Building and Tenants, where to store Materials, how to keep Temp Power and Phone active + safe, are other Contractors "Work-with'able".

* Project - Service Upgrades:
The biggest challenge I face is a smooth and rapid "Change-Over" from the existing power system to the new one.
A typical example: upgrade of an 800 Amp 480Y/277V 3Ø 4 Wire Service, to a new 2,000 Amp 480Y/277V Service.
New Gear at a new location. New Service Feeders to PMT Vault. PoCo increases Transformer size (new Xfmr) and maybe the Primary Feeders.
Working together with everyone involved results in having a Meter set on the New Gear at the time of Transformer upgrade. Cutting everything over to the New Service takes place during this small time window.

The only preliminary site survey data which is helpful on these (for me) is to collect as many facts about what is "crucial" (i.e. Alarm systems, File Servers, Fax Servers, critical equipment, etc.) - and form a great game plan with the crew.

Is this of any help??? [Linked Image] [Linked Image]

Scott35


Scott " 35 " Thompson
Just Say NO To Green Eggs And Ham!
Re: Job Site Inspection?? #158023
04/03/06 02:03 AM
04/03/06 02:03 AM
Scott35  Offline

Broom Pusher and
Member
Joined: Oct 2000
Posts: 2,708
Anaheim, CA. USA
***BUMP***

Scott35


Scott " 35 " Thompson
Just Say NO To Green Eggs And Ham!
Re: Job Site Inspection?? #158024
04/03/06 07:14 PM
04/03/06 07:14 PM
L
LK  Offline
Member
Joined: Jan 2003
Posts: 1,429
New Jersey
Checking with the utility company, when load changes exist.

Part of planning may require, calling mark-out, if any underground work is required.

Checking with the building, and zoning department, may be required, before planning.

Checking the finincal condition of the customer.

Not everything to look at, is at the site.

Re: Job Site Inspection?? #158025
06/22/06 01:55 PM
06/22/06 01:55 PM
I
iwire  Offline
Moderator
Joined: Jan 2003
Posts: 4,391
North Attleboro, MA USA
Along with the other good suggestions, I have one other important issue.

Lunch.

Where are the good local lunch spots.

Bob (only half kidding [Linked Image])


Bob Badger
Construction & Maintenance Electrician
Massachusetts
Re: Job Site Inspection?? #158026
06/23/06 04:50 PM
06/23/06 04:50 PM
T
TNSunny  Offline
Member
Joined: Dec 2005
Posts: 44
Tennessee
This mainly applies to residential, but is somewhat applicable to commercial as well. When doing main panel change-outs, I've learned to pull the cover on the existing panel and count the number of conductors entering the panel. I've bid a couple of jobs by looking at the number of breakers, only to find when I started the work that most of the breakers had two wires connected to them - and they weren't Square D load centers. Rather than terminating 15 circuits, I may actually be terminating 20 or 30. The cost of additional circuit breakers, plus the additional time of terminating the wires, adds up pretty quick.

Also, I've learned to carefully check to see how easy it will be to move existing circuits or install new ones - even if I have to climb in the attic or crawl under the house. Having an obstacle in your way could add several feet to each circuit run. Multiply that by 30 circuits and you could easily have several hundred feet of additional wire.

Kevin


Kevin

Featured:

2017 Master Electrician Exam Preparation Combos
2017 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
togol
togol
NW In. USA
Posts: 421
Joined: September 2005
Show All Member Profiles 
Top Posters(30 Days)
Admin 13
Trumpy 11
Popular Topics(Views)
249,422 Are you busy
187,343 Re: Forum
176,685 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.6.1
(Release build 20180101)
Page Time: 0.019s Queries: 14 (0.004s) Memory: 0.9903 MB (Peak: 1.1434 MB) Zlib enabled. Server Time: 2018-09-24 08:17:43 UTC