ECN Electrical Forum - Discussion Forums for Electricians, Inspectors and Related Professionals
ECN Shout Chat
ShoutChat
Recent Posts
Square D "All-In-One" Panelboard
by NORCAL - 11/30/21 12:48 PM
Where is Everyone?
by luckyshadow - 11/21/21 10:14 AM
It's been an interesting career
by The Watt Doctor - 11/19/21 09:56 AM
Well I am back to stay (nearly 6 years)
by The Watt Doctor - 11/19/21 09:17 AM
Motor Load Relationships Between Fans and Pumps
by The Watt Doctor - 11/18/21 09:24 AM
New in the Gallery:
240/208 to a house
240/208 to a house
by wa2ise, October 9
Now you know.
Now you know.
by Tom_Horne, September 7
Who's Online Now
0 members (), 20 guests, and 17 robots.
Key: Admin, Global Mod, Mod
Previous Thread
Next Thread
Print Thread
Rate Thread
#12601 08/12/02 09:44 PM
Joined: Aug 2002
Posts: 2
M
makyts Offline OP
Junior Member
In existing multifamily dwelling (the action is taking place in Chicago) the part of service entrance conduit (circle area on the pictures bellow) has been eaten by rust. The building is ( and has to be ) occupied and has to survive 6 months without replacing that service conduit. Service is life front, building is 80 years old, so replacing conduit means :
1)replacing both service conduits, replacing the old service, and old feeders
2)new service conduits, new service, and new feeders size has to be according to new standards NEC2002 AND CEC2002
so this is classic “chain reactions” or (...)
Wires are also very old (around 80 years !? ) and covered with asphalt type insulation
So far nothing has happened ( no major fireworks ) but I think the clock is ticking…

Any ideas how to temporary protect ( against : rain, snow , and unforeseen events) that rusted area ?


Regards

makyts

[Linked Image from home.att.net]
[Linked Image from home.att.net]
[Linked Image from home.att.net]

#12602 08/12/02 10:47 PM
Joined: Jul 2002
Posts: 175
E
Member
On a day when the area is thoroughly dry, blow out the dirt and debris with air, carefully fill the rusted out cavity with silicone caulk.
Then build a form and pour a concrete "block" over the area for physical protection.

Ed

#12603 08/15/02 06:06 PM
Joined: Dec 2001
Posts: 440
Likes: 1
Member
Ed has a good idea. Let me throw another one your way. I would build a box or chase around the conduits, and attach it to the wall. IMHO if those conductors are going to "blow up" in the next 6 months, they are going to do it no matter what you do to try to prevent it. I wouldn't be as concerned about a phase to phase fault as I would a phase to ground fault that energizes one of the service entrance conduits.
I think I would call the City of Chicago electrical inspections department, and have an inspector come out to have a look at it with you. Tell him your situation, and I'm sure that y'all can come up with a solution.

This message will self destruct in 5 seconds,
Doc


The Watt Doctor
Altura Cogen
Channelview, TX
#12604 08/15/02 06:49 PM
Joined: Apr 2001
Posts: 41
S
Member
if i was u i would not touch anything i would not want to be held liable if some fireworks do start and cause a fire sometimes it is better to just walk away if they do not allow u to fix it the wright way dont do anything at all


Link Copied to Clipboard
Featured:

Tools for Electricians
Tools for Electricians
 

* * * * * * *

2020 Master Electrician Exam Preparation Combos
2020 NEC Electrician
Exam Prep Combos:
Master / Journeyman

 

Member Spotlight
CharlieE
CharlieE
Indianapolis
Posts: 201
Joined: April 2004
Top Posters(30 Days)
Admin 3
dsk 2
Popular Topics(Views)
286,325 Are you busy
218,789 Re: Forum
204,945 Need opinion
Powered by UBB.threads™ PHP Forum Software 7.7.5