We are not talking about inspecting a fire pump controller at a nuke plant. This is one stinking acorn with a piece of wire under it. Do you really think the guy the EC would free up to go put this on is any smarter than the guy who puts in the footer steel?
Do you think seeing if this is tight is beyond the abilities of the structural inspector? At least he will be there looking in the hole. The electrical inspector will probably sign this off out the window of his truck