Steve what would you do if the design called for future circuits (intended to serve hard wired equipment) to be installed and capped off or landed in a disconnect.

Let's say the design says the equipment will be installed at an unknown later date.

This would be the same thing as the light fixtures being installed after the wiring has been signed off on.

Roger