I wonder if bonding beyond that normally required by the NEC would solve most or all of the problems, and I wonder how the homeowner and workers managed to ignore this issue until the electrical inspector showed up.
It might very well have been a time of year thing, or perhaps all of the construction was at night when line currents were lower