i think walking the job is necessary and whereever i can i do.
The way i do it is as simple
flatrate.period.works for me on every job as long as I estimate the time needed right,which is on me when I walk the job
flatrate is a great system
and yes i agree again with LK for the posted work the price seems to be really low
In my opinion it is really time to update rates for electrical work to todays standards.same as every plumber did roofer carpenter etc etc.