It's about 20 min drive. I don't need to add smokes. I will be pulling 3 new circuits. One for lighting, one for receptacles, and a dedicated line for a freezer. The panel is right there for 2 of the circuits, and the freezer curcuit is all the way at the other end of the basement. As far as the TV and phone goes, I am waiting fro an answer from the GC. But these will probably be so easy to run it's pathetic. The feeds are right there.

do you usually charge the same for tv/data/phone as line voltage openings?