Reno,
I'm a guy with senior moments also, so no problem.
Here, 'all-in-ones' do not exist. Common for a SFD is riser to meter pan, to panel, or to a main disco IF the panel is not behind or directly in the basement. (Let's not go there with the "distance")
Multi-family use meter stacks. and over six they have a main disco.
Now, with the 2020 requirement of the 'emergency switch' on the exterior, there will be a 'main' after the meter.
With the current materials issues, that has been a problem. Our POCO has yet to approve a meter/main combo unit.
BTW, Thank you for generating a thread that generated some debate.