The house next door has the meter at 11', the old elevation there. It looks silly and I bet the PoCo was real happy when the digital meter (remote read) was installed.
It appears they have made an exception for the utility owned stuff now so the gutter and the meters will be installed at grade. We are still waiting for an answer to the question about the panels. My guess is they will allow a grade level service disconnect and then pipe in the main feeders to to each unit.
Since this is that shady installation we talked about before (calling a 4 plex a duplex) I suggested they still rough in 2 extra meter cans and feed the feeders to the 2 extra units through there. I am sure they are not tricking anyone anyway. They should at least pipe in the extra units before the drywall goes up.
This gets sillier every time I look at it. The duplex is up and down, not side by side (not one on each floor)
That does not even pass the laugh test when you look at the floor plan. There is no wall or door between the units on each floor and they share the only set of steps.
I bet they get spiked before they ever get to CO. My wife is so frustrated with this deception she is about to quit.


Greg Fretwell