Greg:

Back when I was in the beach town, after Sandy hit it was.....

BFE plus the local ord. of 2' added was the 'flood zone'.. The utility required the meter at 5' above grade, and all distribution had to be at BFE plus 2'. (Made it really hard for a meter/main combo.)

Receptacles and switching/lighting within the 'flood zone' were allowed, but it had to be PVC conduit to facilitate 'future replacement'.

During my 11/2 years there, the 'rules' changed . Day one was 'nothing below BFE', so you had some utility meters at 16' above dirt. The POCO was livid, and I had no choice but tell them to contact DCA, who made the ruling. After a few weeks, it change to meter at 5', but it was chaos. Glad I'm out of there.